Productivity improvement through a sequencing generalised assignment in an assembly line system

被引:12
|
作者
Moussavi, Seyed-Esmaeil [1 ]
Mahdjoub, Morad [2 ]
Grunder, Olivier [1 ]
机构
[1] UTBM, Univ Bourgogne Franche Comte, Nanomed Lab, Belfort, France
[2] UTBM, Univ Bourgogne Franche Comte, ELLIADD Lab, Montbeliard, France
关键词
production cycle time; manpower planning; generalised assignment problem; matheuristic solving method; truck assembly line; TABU SEARCH; GENETIC ALGORITHM; BOUND ALGORITHM; BEES ALGORITHM; TIME;
D O I
10.1080/00207543.2017.1378828
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers the assignment of heterogeneous workers to workstations of an assembly line in order to minimise the total production time. As the structure of the system implies that each of the workstations needs at least one worker, thus the problem can be considered as a generalised assignment problem (GAP). The objective is to perform an efficient human resource planning for a specified horizon consisting of several periods. Hence, we present an extension of the generalised assignment problem, consisting of a set of GAPs (one for each planning period) in which each GAP depends on the previous ones. A mixed integer mathematical model is presented for this sequencing assignment problem. The model is solved by an exact algorithm using Gurobi solver. It is proved that the problem is NP-hard and solving the medium and large size instances is not possible by the exact algorithms. Hence, two matheuristic approaches based on the disaggregated formulation of GAP are proposed. The first approach solves the problem through two sub-problems as the transportation formulation and assignment formulation. The second approach solves the problem by decomposition of the problem into several classical GAPs. The approaches are examined by a total of 27 instances. The results illustrate the efficiency of the proposed algorithms in the computational time and accuracy of the solutions.
引用
收藏
页码:7509 / 7523
页数:15
相关论文
共 50 条
  • [1] A hybrid heuristic algorithm for the sequencing generalized assignment problem in an assembly line
    Moussavi, S. E.
    Mandjoub, M.
    Grunder, O.
    [J]. IFAC PAPERSONLINE, 2018, 51 (02): : 695 - 700
  • [2] Assembly line productivity improvement as re-engineered by MOST
    Karim, A. N. Mustafizul
    Tuan, Saravanan Tanjong
    Kays, H. M. Emrul
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2016, 65 (07) : 977 - 994
  • [3] Assembly line productivity improvement through TPM by controlling line organisation efficiency and out of balance index: an empirical exploration
    Gupta, Pardeep
    Mittal, Ankesh
    Hooda, Aman
    Gupta, Niharika
    [J]. INTERNATIONAL JOURNAL OF INDIAN CULTURE AND BUSINESS MANAGEMENT, 2022, 26 (01) : 1 - 18
  • [4] Productivity improvement by application of simulation and lean approaches in an multimodel assembly line
    Harish, D. R.
    Gowtham, T.
    Arunachalam, Amirthan
    Narassima, M. S.
    Lamy, D.
    Thenarasu, M.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2024, 238 (6-7) : 1084 - 1094
  • [5] Productivity improvement through assembly line balancing by using simulation modeling in case of Abay garment industry Gondar
    Teshome, Melkamu Mengistnew
    Meles, Tamrat Yifter
    Yang, Chao-Lung
    [J]. HELIYON, 2024, 10 (01)
  • [6] On Energy Consumption and Productivity in a Mixed-Model Assembly Line Sequencing Problem
    Paprocka, Iwona
    Krenczyk, Damian
    [J]. ENERGIES, 2023, 16 (20)
  • [7] Production improvement on the assembly line through cycle time optimization
    Pankaj Kumar
    Shashi Bhushan Prasad
    Dharmendra Patel
    Laxmi Gupta
    Manmeet Bali Nag
    Priyanka Chadha
    [J]. International Journal on Interactive Design and Manufacturing (IJIDeM), 2023, 17 : 2617 - 2630
  • [8] Production improvement on the assembly line through cycle time optimization
    Kumar, Pankaj
    Prasad, Shashi Bhushan
    Patel, Dharmendra
    Gupta, Laxmi
    Nag, Manmeet Bali
    Chadha, Priyanka
    [J]. INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2023, 17 (05): : 2617 - 2630
  • [9] Productivity improvement in poly-cover packing line through line balancing and automation
    Harikrishnan, R.
    Rajeswaran, M.
    Kumar, S. Sathish
    Dinesh, K.
    [J]. MATERIALS TODAY-PROCEEDINGS, 2020, 33 : 102 - 111
  • [10] A DAILY SYSTEM FOR BALANCING AND SEQUENCING A MIXED MODEL ASSEMBLY LINE
    COLLEY, JL
    [J]. ELECTRONISCHE DATENVERARBEITUNG, 1969, 11 (12): : 594 - &