Productivity improvement through assembly line balancing by using simulation modeling in case of Abay garment industry Gondar

被引:0
|
作者
Teshome, Melkamu Mengistnew [1 ]
Meles, Tamrat Yifter [2 ]
Yang, Chao-Lung [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 10657, Taiwan
[2] Univ Gondar, Inst Technol, Dept Ind Engn, Gondar, Ethiopia
关键词
Productivity; Line efficiency; Line balancing; Simulations modeling; Garment; PERFORMANCE;
D O I
10.1016/j.heliyon.2023.e23585
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This study aims to balance the garment line of the polo shirt operation by utilizing line balancing techniques. These techniques are employed to enhance the efficiency and productivity of the Abay garment industry. Observational methods and stopwatch timing were employed to collect data on the processing times for each operation. Subsequently, the standard allowed minute was determined based on work measurement principles. To assess statistical significance and identify appropriate expressions for the existing simulation modeling, all collected data underwent sta-tistical analysis using the Arena input analyzer. Moreover, Arena simulation software was employed in this research to simulate and evaluate the effectiveness of both the current and proposed polo shirt sewing line models. Building upon the existing model, alternative improved models were proposed. The alternative models yielded significant improvements in multiple performance metrics, including output, capacity utilization, waiting time in queues, and number of products waiting. These improvements indicate an increase in productivity resulting from the implementation of balanced production lines. The outcomes of the improved scenario included an increase in output from 288 to 381, a rise in line efficiency from 39.06 % to 55.64 %, and an enhancement in labor productivity from 54.25 % to 66 %. Additionally, the cost of labor was reduced by 15.63 %, while revenue experienced a notable increase of 30 %.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Assembly line balancing in garment industry
    Chen, James C.
    Chen, Chun-Chieh
    Su, Ling-Huey
    Wu, Han-Bin
    Sun, Cheng-Ju
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (11) : 10073 - 10081
  • [2] Improvement of garment assembly line efficiency using line balancing technique
    Bongomin, Ocident
    Mwasiagi, Josphat, I
    Nganyi, Eric O.
    Nibikora, Ildephonse
    [J]. ENGINEERING REPORTS, 2020, 2 (04)
  • [3] Simulated Annealing for the Assembly Line Balancing Problem in the Garment Industry
    Mai Huong Dinh
    Viet Dung Nguyen
    Van Long Truong
    Phan Thum Do
    Thanh Thao Phan
    Duc Nghia Nguyen
    [J]. SOICT 2019: PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON INFORMATION AND COMMUNICATION TECHNOLOGY, 2019, : 36 - 42
  • [4] A complex garment assembly line balancing using simulation-based optimization
    Bongomin, Ocident
    Mwasiagi, Josphat Igadwa
    Nganyi, Eric Oyondi
    Nibikora, Ildephonse
    [J]. ENGINEERING REPORTS, 2020, 2 (11)
  • [5] Simulation for Balancing of Assembly Line using Heuristics: A Case Study of Automotive Manufacturing Industry
    Salami, Musharaf
    Liu, Xiao-Jun
    [J]. 2022 IEEE 6TH ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2022, : 1674 - 1678
  • [6] Productivity Improvement Through Line Balancing at Electronic Company - Case Study
    Fansuri, A. F. H.
    Rose, A. N. M.
    Ab Rashid, M. F. F.
    Mohamed, Nik N. M. Z.
    Ahmad, H.
    [J]. 3RD INTERNATIONAL CONFERENCE ON MANUFACTURING, MATERIAL AND METALLURGICAL ENGINEERING, 2018, 409
  • [7] A GROUPING GENETIC ALGORITHM FOR THE ASSEMBLY LINE BALANCING PROBLEM OF SEWING LINES IN GARMENT INDUSTRY
    Chen, James C.
    Hsaio, Mabel H.
    Chen, Chun-Cheh
    Sun, Cheng-Ju
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 2811 - 2816
  • [8] Productivity Improvement through Reengineering and Simulation: A Case Study in a Footwear-Industry
    Calderon-Andrade, Ruben
    Selene Hernandez-Gress, Eva
    Montufar Benitez, Marco Antonio
    [J]. APPLIED SCIENCES-BASEL, 2020, 10 (16):
  • [9] Analysis of productivity improvement using line balancing method (study case assembling line in PT XYZ)
    Iwan, R.
    [J]. INTERNATIONAL CONFERENCE ON DESIGN, ENGINEERING AND COMPUTER SCIENCES, 2018, 453
  • [10] SIMULATION FOR JEWELRY PRODUCTION PROCESS IMPROVEMENT USING LINE BALANCING: A CASE STUDY
    Supsomboon, Srisawat
    [J]. MANAGEMENT SYSTEMS IN PRODUCTION ENGINEERING, 2019, 27 (03) : 127 - 137