An approach to schedule estimation and tracking for rapid development projects

被引:0
|
作者
Lovrek, I [1 ]
Sinkovic, V [1 ]
Grahovac, D [1 ]
Caric, A [1 ]
机构
[1] Univ Zagreb, Fac Elect & Comp Engn, Dept Telecommun, HR-10000 Zagreb, Croatia
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper deals with schedule estimation for rapid development software projects based on a constructive cost model and fine-grain tracking implemented by miniature milestones. Rapid development environments suitable for small and medium-size new products on open platforms, as well as the products on proprietary platforms achievable with small design changes of the existing software, have been defined. Proposed is a lifecycle combining waterfall model with phase overlapping for early development phases, and incremental build for late development phases. Estimation and tracking models are described. as well as a fuse study of a real project on Internet/WWW/Java platform.
引用
收藏
页码:816 / 823
页数:2
相关论文
共 50 条
  • [1] A Rapid Supply Chain Appraisal Approach for Agribusiness Development Projects
    Collins, R. J.
    Dunne, A. J.
    PROCEEDINGS OF THE SECOND INTERNATIONAL SYMPOSIUM ON IMPROVING THE PERFORMANCE OF SUPPLY CHAINS IN THE TRANSITIONAL ECONOMIES, 2008, (794): : 73 - 79
  • [2] Tracking software development projects
    Marasco, Joe
    Dr. Dobb's Journal, 2002, 27 (08):
  • [3] Empirical Effort and Schedule Estimation for Enterprise Resource Planning Projects
    Rosa, Wilson
    PROCEEDINGS OF THE 2012 JOINT CONFERENCE OF THE 22ND INTERNATIONAL WORKSHOP ON SOFTWARE MEASUREMENT AND THE 2012 SEVENTH INTERNATIONAL CONFERENCE ON SOFTWARE PROCESS AND PRODUCT MEASUREMENT (IWSM-MENSURA 2012), 2012, : 190 - 197
  • [4] Analysis of cost and schedule performance of international development projects
    Ahsan, Kamrul
    Gunawan, Indra
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (01) : 68 - 78
  • [5] Schedule risk analysis of infrastructure projects: A hybrid dynamic approach
    Xu, Xiaoxiao
    Wang, Jiayuan
    Li, Clyde Zhengdao
    Huang, Wenke
    Xia, Nini
    AUTOMATION IN CONSTRUCTION, 2018, 95 : 20 - 34
  • [6] A Decentralized Evolutional Approach to handle Schedule Execution in Software Projects
    Houari, Nora
    Far, Behrouz H.
    SIXTH INTERNATIONAL CONFERENCE ON AUTONOMIC AND AUTONOMOUS SYSTEMS: ICAS 2010, PROCEEDINGS, 2010, : 116 - 124
  • [7] SCHEDULE CONTINGENCY ANALYSIS FOR TRANSIT PROJECTS USING A SIMULATION APPROACH
    Gurgun, Asli Pelin
    Zhang, Ye
    Touran, Ali
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2013, 19 (04) : 465 - 475
  • [8] A Fuzzy Logic Model for Predicting the Development Schedule of Software Projects
    Lopez-Martin, Cuauhtemoc
    Chavoya, Arturo
    Elena Meda-Campana, Maria
    2015 12TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY - NEW GENERATIONS, 2015, : 415 - 420
  • [9] A cost estimation approach for IoT projects
    Evdokimov, Ivan Valeryevich
    Alalwan, Ameen Raad Jihad
    Tsarev, Roman Yurievich
    Yamskikh, Tatiana Nikolaevna
    Tsareva, Oksana Alekseevna
    Pupkov, Aleksander Nikolaevich
    2018 INTERNATIONAL SEMINAR ON COMPUTER SCIENCE AND ENGINEERING TECHNOLOGY (SCSET 2018), 2019, 1176
  • [10] Measuring and tracking distributed software development projects
    Simmons, DB
    NINTH IEEE WORKSHOP ON FUTURE TRENDS OF DISTRIBUTED COMPUTING SYSTEMS, PROCEEDINGS, 2003, : 63 - 69