An approach to schedule estimation and tracking for rapid development projects

被引:0
|
作者
Lovrek, I [1 ]
Sinkovic, V [1 ]
Grahovac, D [1 ]
Caric, A [1 ]
机构
[1] Univ Zagreb, Fac Elect & Comp Engn, Dept Telecommun, HR-10000 Zagreb, Croatia
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper deals with schedule estimation for rapid development software projects based on a constructive cost model and fine-grain tracking implemented by miniature milestones. Rapid development environments suitable for small and medium-size new products on open platforms, as well as the products on proprietary platforms achievable with small design changes of the existing software, have been defined. Proposed is a lifecycle combining waterfall model with phase overlapping for early development phases, and incremental build for late development phases. Estimation and tracking models are described. as well as a fuse study of a real project on Internet/WWW/Java platform.
引用
收藏
页码:816 / 823
页数:2
相关论文
共 50 条
  • [41] Schedule health assessment of construction projects
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2016, 34 (12) : 875 - 897
  • [42] A neural network approach for DOA estimation and tracking
    Badidi, L
    Radouane, L
    PROCEEDINGS OF THE TENTH IEEE WORKSHOP ON STATISTICAL SIGNAL AND ARRAY PROCESSING, 2000, : 434 - 438
  • [43] Neural network approach for DOA estimation and tracking
    Badidi, L.
    Radouane, L.
    IEEE Signal Processing Workshop on Statistical Signal and Array Processing, SSAP, 2000, : 434 - 438
  • [44] Formant estimation and tracking: A deep learning approach
    Dissen, Yehoshua
    Goldberger, Jacob
    Keshet, Joseph
    JOURNAL OF THE ACOUSTICAL SOCIETY OF AMERICA, 2019, 145 (02): : 642 - 653
  • [45] Development of an Automated Tool for Cost Estimation of Transportation Projects
    Rouhanizadeh, Behzad
    Kermanshachi, Sharareh
    Ramaji, Issa J.
    Shakerian, Shahrad
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2021: TRANSPORTATION PLANNING AND DEVELOPMENT, 2021, : 178 - 190
  • [46] Schedule optimization for scattered repetitive projects
    Hegazy, Tarek
    Kamarah, Ehab
    AUTOMATION IN CONSTRUCTION, 2022, 133
  • [47] TUPUX: An Estimation Tool for Incremental Software Development Projects
    Balbin, David
    Ocrospoma, Michael
    Soto, Emanuel
    Antonio Pow-Sang, Jose
    AST: 2009 INTERNATIONAL E-CONFERENCE ON ADVANCED SCIENCE AND TECHNOLOGY, PROCEEDINGS, 2009, : 39 - 43
  • [48] Issues of organizational behaviour in effort estimation for development projects
    Busby, J.S.
    Payne, K.
    International Journal of Project Management, 1999, 17 (05): : 293 - 300
  • [49] Errors estimation models for embedded software development projects
    Iwata, Kazunori
    Nakashima, Toyoshiro
    Nakashima, Toyoshiro
    Anan, Yoshiyuki
    Ishii, Naohiro
    SERA 2007: 5TH ACIS INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING RESEARCH, MANAGEMENT, AND APPLICATIONS, PROCEEDINGS, 2007, : 815 - +
  • [50] RAPID DEVELOPMENT OF MULTIPLE-SCHEDULE PERFORMANCES WITH RETARDED-CHILDREN
    BIJOU, SW
    ORLANDO, R
    JOURNAL OF THE EXPERIMENTAL ANALYSIS OF BEHAVIOR, 1961, 4 (01) : 7 - 16