The software rejuvenation model with pre-start technology

被引:2
|
作者
He Xin [1 ]
Wei Wei [1 ]
Gui Xiaolin [1 ]
机构
[1] Xi An Jiao Tong Univ, Sch Elect & Informat Engn, Xian 710049, Peoples R China
关键词
software rejuvenation; pre-start technology; availability; markov regenerative process;
D O I
10.1109/ISIP.2008.19
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Software aging related failures can be prevented by applying software rejuvenation technology. But the restart operation in the software rejuvenation phase makes the system unable to provide services, which leads to system unavailability. The software rejuvenation model with pre-start technology is therefore proposed to reduce downtime and improve availability by switching between active copy and backup copy, which can substitute for restart operation and resolve unavailability problem. First of all, the rejuvenation operation of model with pre-start technology is described and improvements on the conventional model are presented Second, the model availability is calculated by Markov Regenerative process. And finally, according to the experimental results, current model proves to be more available than the conventional one.
引用
收藏
页码:723 / 727
页数:5
相关论文
共 50 条
  • [41] Pulse Power Supply for High-Power Semiconductor Laser Diode Arrays With Micro-Current Pre-Start Control
    Zhao, Qinglin
    Cao, Ruru
    Wang, Deyu
    Yuan, Jing
    Li, Shu
    [J]. IEEE ACCESS, 2018, 6 : 76682 - 76688
  • [42] A Phase Expansion Approach for Transient Analysis of Software Rejuvenation Model
    Okamura, Hiroyuki
    Dohi, Tadashi
    [J]. 2016 IEEE 27TH INTERNATIONAL SYMPOSIUM ON SOFTWARE RELIABILITY ENGINEERING WORKSHOPS (ISSREW), 2016, : 98 - 103
  • [43] A Markov Regenerative Model of Software Rejuvenation Beyond the Enabling Restriction
    Carnevali, Laura
    Paolieri, Marco
    Reali, Riccardo
    Scommegna, Leonardo
    Vicario, Enrico
    [J]. 2022 IEEE INTERNATIONAL SYMPOSIUM ON SOFTWARE RELIABILITY ENGINEERING WORKSHOPS (ISSREW 2022), 2022, : 138 - 145
  • [44] Evaluation of a Family-Based Interactive Lifestyle Intervention to Reduce the Risk of Developing Type 2 Diabetes in the Future (PRE-STARt Intervention)
    Brady, Emer M.
    Gray, Laura J.
    Weihrauch-Blueher, Susann
    Edwardson, Charlotte
    Harrington, Deirdre
    Ribeiro, Rogerio T.
    Vazeou, Andriani
    Northern, Alison L.
    Alustiza, Elena
    Jane Davies, Melanie
    [J]. DIABETES, 2018, 67
  • [45] A PRE-START CHECKPOINT PREVENTING MITOSIS IN FISSION YEAST ACTS INDEPENDENTLY OF P34(CDC2) TYROSINE PHOSPHORYLATION
    HAYLES, J
    NURSE, P
    [J]. EMBO JOURNAL, 1995, 14 (12): : 2760 - 2771
  • [46] Pre-start Cleaning of the Main Equipment of Nuclear Power Plants with Channel-Type Uranium-Graphite (RBMK) Reactors.
    Sedov, V.M.
    Krutikov, P.G.
    Zolotukhin, S.T.
    [J]. Teploenergetika, 1979, (07): : 17 - 19
  • [47] A Software Reliability Model for Cloud-Based Software Rejuvenation Using Dynamic Fault Trees
    Rahme, Jean
    Xu, Haiping
    [J]. INTERNATIONAL JOURNAL OF SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING, 2015, 25 (9-10) : 1491 - 1513
  • [48] A Comprehensive Model of Android Software Aging and Rejuvenation Considering Battery Saving
    Yakovyna, Vitaliy
    Uhrynovskyi, Bohdan
    Shakhovska, Natalya
    [J]. ELECTRONICS, 2023, 12 (07)
  • [49] Software Rejuvenation in Cloud Systems
    Puliafito, Antonio
    [J]. 2014 IEEE INTERNATIONAL SYMPOSIUM ON SOFTWARE RELIABILITY ENGINEERING WORKSHOPS (ISSREW), 2014, : 413 - 413
  • [50] Simulation-based optimization approach for software cost model with rejuvenation
    Eto, Hiroyuki
    Dohi, Tadashi
    Ma, Jianhua
    [J]. AUTONOMIC AND TRUSTED COMPUTING, PROCEEDINGS, 2008, 5060 : 206 - +