Setup times and fast tracking in resource-constrained project scheduling

被引:16
|
作者
Vanhoucke, Mario [1 ,2 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
[2] Vlerick Leuven Gent Management Sch, Operat & Technol Management Ctr, Ghent, Belgium
关键词
project scheduling; setup times;
D O I
10.1016/j.cie.2007.11.008
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and the possibility to schedule pre-emptive sub-parts of activities in parallel. The contribution of the paper is twofold. First, we briefly show that an efficient exact branch-and-bound procedure from the literature to solve the resource-constrained project scheduling problem can be easily adapted to cope with our problem extensions. Second, we extensively test the impact of these pre-emptive extensions to the quality of the schedule from a makespan point-of-view. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1062 / 1070
页数:9
相关论文
共 50 条
  • [21] Resource-Constrained Project Scheduling in Hazardous Environment
    Li, Shuai
    Zhang, Zhicong
    Hu, Kaishun
    Zhao, Shaoyong
    Yan, Xiaohui
    [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2266 - 2270
  • [22] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [23] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [24] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [25] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    [J]. NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [26] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [27] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [28] New strategies for stochastic resource-constrained project scheduling
    Salim Rostami
    Stefan Creemers
    Roel Leus
    [J]. Journal of Scheduling, 2018, 21 : 349 - 365
  • [29] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [30] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241