Uncertainty analysis of an integrated hydrological model using posterior covariance matrix from automatic calibration

被引:0
|
作者
Li, Haitao [1 ,5 ]
Kinzelbach, Wolfgang [1 ]
Franssen, Harrie-Jan Hendricks [2 ]
Brunner, Philip [3 ]
Von Boetticher, Albrecht [4 ]
机构
[1] ETH, Inst Environm Engn IfU, CH-8093 Zurich, Switzerland
[2] Forschungszentrum Julich, Inst Chem & Dynm Geosphere, D-52425 Julich, Germany
[3] Univ Neuchatel, Ctr Hydrogeol Geotherm, CH-2009 Neuchatel, Switzerland
[4] Swiss Fed Inst Forest Snow & Landscape Res, CH-8903 Birmensdorf, Switzerland
[5] China Inst Geo Environm Monitoring, Beijing, Peoples R China
关键词
uncertainty analysis; integrated hydrological model; posterior covariance matrix; random generation;
D O I
暂无
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
This study quantifies the output uncertainties of an integrated hydrological model in the Yanqi Basin, Xinjiang, China. Two cases of model calibration were carried out: Case 1 used four parameters for calibration; Case 2: added fifteen more parameters for calibration. In both cases, hydraulic heads and evaporation patterns from NOAA images were used as conditioning information. In Case 1. no pair of adjustable parameters is highly correlated (highest R: 0.48). In Case 2, several pairs of adjustable parameters are highly correlated (highest R: 0.79). To analyse uncertainty, 5000 parameter realizations were generated using the optimized values and posterior covariance matrix from the model calibration cases. The impact of parameter uncertainty on seven selected model predictions is evaluated. The results show that the uncertainty is underestimated in Case 1. Therefore, it is advisable to include as many as possible adjustable parameters in the model calibration for parameter uncertainty analysis. In this way, it allows scanning of a much larger space of feasible solutions, although generally the calibration tries to use the "parsimony" principle.
引用
收藏
页码:27 / +
页数:2
相关论文
共 50 条
  • [31] Covariance-Matrix-Based Uncertainty Analysis for NVNA Measurements
    Lin, Maoliu
    Zhang, Yichi
    IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, 2012, 61 (01) : 93 - 102
  • [32] Uncertainty-based automatic calibration of HEC-HMS model using sequential uncertainty fitting approach
    Mousavi, S. Jamshid
    Abbaspour, K. C.
    Kamali, B.
    Amini, M.
    Yang, H.
    JOURNAL OF HYDROINFORMATICS, 2012, 14 (02) : 286 - 309
  • [33] Groundwater model diagnostic calibration and uncertainty analysis using information theory
    Khorshidi, Mohammad Sadegh
    Izady, Azizallah
    Al-Maktoumi, Ali
    Chen, Mingjie
    Nikoo, Mohammad Reza
    Gandomi, Amir H.
    HYDROLOGICAL SCIENCES JOURNAL, 2024, 69 (07) : 878 - 890
  • [34] Hydrological model calibration using a short period of observations
    Tada, T.
    Beven, K. J.
    HYDROLOGICAL PROCESSES, 2012, 26 (06) : 883 - 892
  • [36] Predictive Analysis and Simulation Uncertainty of a Distributed Hydrological Model
    Abdolreza Bahremand
    Florimond De Smedt
    Water Resources Management, 2010, 24 : 2869 - 2880
  • [37] Predictive Analysis and Simulation Uncertainty of a Distributed Hydrological Model
    Bahremand, Abdolreza
    De Smedt, Florimond
    WATER RESOURCES MANAGEMENT, 2010, 24 (12) : 2869 - 2880
  • [38] Bayesian Uncertainty Analysis of the Distributed Hydrological Model HYDROTEL
    Bouda, Medard
    Rousseau, Alain N.
    Konan, Brou
    Gagnon, Patrick
    Gumiere, Silvio J.
    JOURNAL OF HYDROLOGIC ENGINEERING, 2012, 17 (09) : 1021 - 1032
  • [39] Model calibration and uncertainty analysis for runoff in the Chao River Basin using sequential uncertainty fitting
    Tang, F. F.
    Xu, H. S.
    Xu, Z. X.
    18TH BIENNIAL ISEM CONFERENCE ON ECOLOGICAL MODELLING FOR GLOBAL CHANGE AND COUPLED HUMAN AND NATURAL SYSTEM, 2012, 13 : 1760 - 1770
  • [40] An integrated degradation modeling framework considering model uncertainty and calibration
    Lin, Yan-Hui
    Ding, Ze-Qi
    MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2022, 166