A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects

被引:6
|
作者
Nabi, Mohamad Abdul [1 ]
El-adaway, Islam H. [2 ,3 ,4 ,5 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Construct Engn & Management, Rolla, MO 65409 USA
[3] Missouri Univ Sci & Technol, Civil Engn, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO 65409 USA
关键词
Modular construction; Integrated risk assessment; Modular risks; OFFSITE CONSTRUCTION; PREFABRICATION; PERFORMANCE; SIMULATION; COST; BARRIERS; SYSTEM; MANAGEMENT; ELEMENTS; MODEL;
D O I
10.1061/(ASCE)CO.1943-7862.0002311
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Various studies developed models and decision support tools to assess the feasibility and optimize the use of modularization. However, none has explored the schedule benefits of modular construction. This paper fills this knowledge gap. To this end, the authors completed the following: (1) analyzed the criticalities of the various modular risk factors on potential schedule savings using data collected from 48 industry professionals, (2) investigated the schedule savings associated with the use of modularization using data collected from 68 modular construction projects, and (3) developed an interrelated assessment model to calculate the schedule savings of using modularization. The provided model was verified using extreme conditions, surprised behavior tests, and sensitivity analysis. Also, it was validated by industry experts. The results show that design and engineering issues, regulatory and organizational matters, and resources and technology aspects are among the top parameters affecting schedule savings of modularized construction projects. This research adds to the body of knowledge by developing a decision-making benchmark that can assist project stakeholders in making proactive decisions, suitable mitigating strategies, and early corrective actions to ensure maximized capitalization on the schedule benefits of modularization in the construction industry.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Hierarchical risk communication management framework for construction projects
    Mansour M.A.
    Beithou N.
    Alsqour M.
    Tarawneh S.A.
    Al Rababa'a K.
    AlSaqoor S.
    Chodakowska E.
    [J]. Engineering Management in Production and Services, 2023, 15 (04) : 104 - 115
  • [22] A Risk Assessment Framework for Airport Development Projects
    Hopper, Anna
    [J]. TRANSPORTATION RESEARCH RECORD, 2018, 2672 (29) : 35 - 47
  • [23] Analysis on Multi-factorial Risk Coupling Effect of Construction schedule of Large Construction Projects
    Hou Xueliang
    Liu Kai
    [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND TRANSPORTATION 2015, 2016, 30 : 395 - 399
  • [24] Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage
    Low, W. W.
    Wong, K. S.
    Lee, J. L.
    [J]. 3RD INTERNATIONAL CONFERENCE ON SCIENCE, TECHNOLOGY, AND INTERDISCIPLINARY RESEARCH (IC-STAR), 2018, 344
  • [25] Integrated Risk of Progress-Based Costs and Schedule Delays in Construction Projects
    Pehlivan, Salahi
    Oztemir, Ali Erhan
    [J]. ENGINEERING MANAGEMENT JOURNAL, 2018, 30 (02) : 108 - 116
  • [26] Application of probabilistic cost and schedule risk assessment and risk management to large infrastructure projects
    McGrath, T. C.
    Roberds, W. J.
    Keizur, A. E.
    del Olmo, A. Gutierrez
    Barbato, I.
    [J]. SAFETY AND RELIABILITY FOR MANAGING RISK, VOLS 1-3, 2006, : 2093 - +
  • [27] RISK ASSESSMENT THROUGH CONSTRUCTION SEQUENCE ANALYSIS FOR PLANT CONSTRUCTION PROJECTS
    Kim, Jihye
    Choi, Jaehyun
    [J]. SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 495 - 500
  • [28] Risk assessment for construction projects of transport infrastructure objects
    Titarenko, Boris
    [J]. ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017), 2017, 90
  • [29] Safety risk assessment in construction projects at Hasanuddin University
    Darwis, A. Muflihah
    Nai'em, M. Furqaan
    Thamrin, Yahya
    Noviponiharwani
    Rahmadani, Suci
    Amin, Fauziah
    [J]. GACETA SANITARIA, 2021, 35 : S385 - S387
  • [30] Risk-Informed Performance Assessment of Construction Projects
    Papanikolaou, Merkourios
    Xenidis, Yiannis
    [J]. SUSTAINABILITY, 2020, 12 (13)