A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects

被引:6
|
作者
Nabi, Mohamad Abdul [1 ]
El-adaway, Islam H. [2 ,3 ,4 ,5 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Construct Engn & Management, Rolla, MO 65409 USA
[3] Missouri Univ Sci & Technol, Civil Engn, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO 65409 USA
关键词
Modular construction; Integrated risk assessment; Modular risks; OFFSITE CONSTRUCTION; PREFABRICATION; PERFORMANCE; SIMULATION; COST; BARRIERS; SYSTEM; MANAGEMENT; ELEMENTS; MODEL;
D O I
10.1061/(ASCE)CO.1943-7862.0002311
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Various studies developed models and decision support tools to assess the feasibility and optimize the use of modularization. However, none has explored the schedule benefits of modular construction. This paper fills this knowledge gap. To this end, the authors completed the following: (1) analyzed the criticalities of the various modular risk factors on potential schedule savings using data collected from 48 industry professionals, (2) investigated the schedule savings associated with the use of modularization using data collected from 68 modular construction projects, and (3) developed an interrelated assessment model to calculate the schedule savings of using modularization. The provided model was verified using extreme conditions, surprised behavior tests, and sensitivity analysis. Also, it was validated by industry experts. The results show that design and engineering issues, regulatory and organizational matters, and resources and technology aspects are among the top parameters affecting schedule savings of modularized construction projects. This research adds to the body of knowledge by developing a decision-making benchmark that can assist project stakeholders in making proactive decisions, suitable mitigating strategies, and early corrective actions to ensure maximized capitalization on the schedule benefits of modularization in the construction industry.
引用
收藏
页数:18
相关论文
共 50 条
  • [11] Satisfaction assessment in construction projects: a conceptual framework
    Nzekwe-Excel, Chinny
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2012, 2 (01) : 86 - 102
  • [12] Risk assessment in construction projects of Iraq
    Alklkali, Ali Moosa Taqi
    [J]. JOURNAL OF ALGEBRAIC STATISTICS, 2022, 13 (01) : 517 - 525
  • [13] Framework for Proactive Change Management: Assessing the Risk of Change in Construction Projects Using Fuzzy Fault Tree Analysis
    Abad, Fatemeh
    Eshtehardian, Ehsan
    Taghizade, Katayoun
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2019, 25 (02)
  • [14] Emergency schedule in the risk assessment of the construction project
    Skorupka, Dariusz
    [J]. Prace Naukowe Instytutu Budownictwa Politechniki Wroclawskiej, 2008, (91): : 299 - 306
  • [15] Schedule Performance of Construction Manager at Risk (CMAR) Delivery on Pipeline Engineering and Construction Projects
    Francom, Tober
    El Asmar, Mounir
    Ariaratnam, Samuel T.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 569 - 578
  • [16] Quantifying schedule risk in construction projects using Bayesian belief networks
    Luu, Van Truong
    Kim, Soo-Yong
    Nguyen Van Tuan
    Ogunlana, Stephen O.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (01) : 39 - 50
  • [17] Development of a Risk Assessment System for Construction Projects
    Patrinou, A. G.
    Chassiakos, A. P.
    [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [18] Risk assessment methodology for underground construction projects
    Choi, HH
    Cho, HN
    Seo, JW
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) : 258 - 272
  • [19] THE METHODOLOGY OF RISK ASSESSMENT IN THE PLANNING OF CONSTRUCTION PROJECTS
    Szafranko, Elzbleta
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE CONTEMPORARY ISSUES IN THEORY AND PRACTICE OF MANAGEMENT: CITPM 2016, 2016, : 430 - 437
  • [20] Sustainability risk assessment in mega construction projects
    Coskun, Cansu
    Dikmen, Irem
    Birgonul, M. Talat
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2023, 13 (05) : 700 - 718