A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects

被引:6
|
作者
Nabi, Mohamad Abdul [1 ]
El-adaway, Islam H. [2 ,3 ,4 ,5 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Construct Engn & Management, Rolla, MO 65409 USA
[3] Missouri Univ Sci & Technol, Civil Engn, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO 65409 USA
关键词
Modular construction; Integrated risk assessment; Modular risks; OFFSITE CONSTRUCTION; PREFABRICATION; PERFORMANCE; SIMULATION; COST; BARRIERS; SYSTEM; MANAGEMENT; ELEMENTS; MODEL;
D O I
10.1061/(ASCE)CO.1943-7862.0002311
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Various studies developed models and decision support tools to assess the feasibility and optimize the use of modularization. However, none has explored the schedule benefits of modular construction. This paper fills this knowledge gap. To this end, the authors completed the following: (1) analyzed the criticalities of the various modular risk factors on potential schedule savings using data collected from 48 industry professionals, (2) investigated the schedule savings associated with the use of modularization using data collected from 68 modular construction projects, and (3) developed an interrelated assessment model to calculate the schedule savings of using modularization. The provided model was verified using extreme conditions, surprised behavior tests, and sensitivity analysis. Also, it was validated by industry experts. The results show that design and engineering issues, regulatory and organizational matters, and resources and technology aspects are among the top parameters affecting schedule savings of modularized construction projects. This research adds to the body of knowledge by developing a decision-making benchmark that can assist project stakeholders in making proactive decisions, suitable mitigating strategies, and early corrective actions to ensure maximized capitalization on the schedule benefits of modularization in the construction industry.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Schedule health assessment of construction projects
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2016, 34 (12) : 875 - 897
  • [2] A Schedule Risk Assessment Model of Construction Projects Based on Bayesian Network
    Liu Zheng
    Ma Guofeng
    [J]. PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 106 - 111
  • [3] Inherent Delay Risk Assessment in Construction: A proactive approach, mitigating the impact of causes of delay on schedule
    Amarkhil, Qais
    Elwakil, Emad
    Hubbard, Bryan J.
    [J]. 2021 IEEE CONFERENCE ON TECHNOLOGIES FOR SUSTAINABILITY (SUSTECH2021), 2021,
  • [4] Novel method for schedule risks assessment in construction projects from perspective of risk chain
    Cao, Jiming
    Shen, Liangfa
    Peng, Wei
    Ma, Teng
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2015, 43 (03): : 468 - 474
  • [5] Detection of schedule delay risk of empirical construction projects
    Tsegay GEBREHIWET
    Hanbin LUO
    [J]. Frontiers of Engineering Management, 2018, (02) : 251 - 267
  • [6] Detection of schedule delay risk of empirical construction projects
    Gebrehiwet, Tsegay
    Luo, Hanbin
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2018, 5 (02) : 251 - 267
  • [7] Detection of schedule delay risk of empirical construction projects
    Tsegay GEBREHIWET
    Hanbin LUO
    [J]. Frontiers of Engineering Management, 2018, 5 (02) - 267
  • [8] RISK ASSESSMENT OF CONSTRUCTION PROJECTS
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 33 - 46
  • [9] Risk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects
    Abdul Nabi, Mohamad
    El-adaway, Islam H.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (10)
  • [10] Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects
    Schatteman, Damien
    Herroelen, Willy
    Van de Vonder, Stijn
    Boone, Anton
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 885 - 893