共 50 条
- [43] Using PIPS to minimize causes of delay in Saudi Arabian construction projects: university case study [J]. ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 932 - 939
- [46] Barriers to Implement Building Information Modeling (BIM) in Public Projects in Saudi Arabia [J]. ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE (AHFE 2017), 2018, 600 : 119 - 125
- [47] Analysis of production costs structure in broiler projects in the central region, Saudi Arabia [J]. ARAB GULF JOURNAL OF SCIENTIFIC RESEARCH, 1997, 15 (01): : 207 - 221