Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia

被引:26
|
作者
Abdellatif, Hussein [1 ]
Alshibani, Adel [2 ]
机构
[1] KFUPM, Elect Engn Dept, Dhahran 31261, Saudi Arabia
[2] KFUPM, Construct Engn & Management, Dhahran 31261, Saudi Arabia
关键词
industrial projects; delay factors; scheduling; RII; building projects; RESOURCE-BASED THEORY; CONSTRUCTION PROJECTS; COST; ORGANIZATION; ECONOMICS; OVERRUNS; INDUSTRY; RANKING; MODEL; RISK;
D O I
10.3390/buildings9040093
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There have been many studies done on the causes of delay on construction projects and building projects all around the world. They use different methods, on different geographical areas, and they come up with different results. There are, however, few studies on industrial and building projects. This paper focuses on industrial/manufacturing projects in Saudi Arabia. The aim of this paper is to identify the major causes of delay in the manufacturing projects in Saudi Arabia. The top causes of delay have been identified through a literature survey and interviews with experts from the industrial field in Saudi Arabia. Twenty-two factors have been identified and listed in a survey that was distributed to professionals in the same field. Two categorizations were made: the first is based on the impact of the cause, and the second is based on the frequency of occurrence of the identified cause. It has been found that the top five impacted causes of delay in the delivery of industrial projects in Saudi Arabia are: difficulties in financing project by contractor/manufacturer, late procurement of materials, late delivery of materials, delay in progress payments, and delay in approving design documents, respectively. In terms of frequency, the top five identified causes are: delay in progress payments, difficulties in financing project by contractor/manufacturer, slowness in decision making, late procurement of materials, and delay in approving design documents, respectively. The diversity of the participants is an important point; therefore, the respondents were from different job positions (management, engineering, etc.), and different categories (contractor, owner, manufacturer, consultant, etc.). It is worth noting that this paper serves not only as an authentic study of the causes of delay in the delivery of industrial projects in Saudi Arabia which is a field that is not widely covered, but also as a fresh paper that gives an indication of the changes that happen to the business over time as compared to previous work.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects
    Alajmi, Abdulali Mohammed
    Memon, Zubair Ahmed
    [J]. SMART CITIES, 2022, 5 (04): : 1465 - 1487
  • [2] Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects
    Gopang, Raja Khan Mohammed
    Imran, Qadir Bux alias
    Nagapan, Sasitharan
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 225 - 233
  • [3] Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia
    Alhajri, Abdullah Rasheed
    Alshibani, Adel
    [J]. ENERGIES, 2018, 11 (07):
  • [4] The significant factors causing delay of building construction projects in Malaysia
    Alaghbari, Wa'el
    Kadir, Mohd. Razali A.
    Salim, Azizah
    Ernawati
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) : 192 - +
  • [5] Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia
    Alshihri, Saad
    Al-Gahtani, Khalid
    Almohsen, Abdulmohsen
    [J]. BUILDINGS, 2022, 12 (07)
  • [6] Assessment of scope definition for building projects in Saudi Arabia
    Aljadhai, Saad
    Alqahtani, Fahad K.
    Aldakhel, Abdullah
    Alharbi, Majed
    Yamany, Mohamed S.
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,
  • [7] Modeling Knowledge for MEP Coordination in Building Projects in Saudi Arabia
    Hassanain, Mohammad A.
    Adewale, Babatunde O.
    Al-Hammad, Abdul-Mohsen
    Sanni-Anibire, Muizz O.
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2019, 25 (02)
  • [8] Owners' perspective of factors contributing to project delay: case studies of road and bridge projects in Saudi Arabia
    Elawi, Ghazi Saad A.
    Algahtany, Mohammed
    Kashiwagi, Dean
    [J]. ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 1402 - 1409
  • [9] Proactive Approach to Measure Safety Management on Building Projects in Saudi Arabia
    Choudhry, Rafiq M.
    Zafar, Idrees
    Almatawa, Mansour Saleh
    [J]. ADVANCES IN CIVIL ENGINEERING, 2023, 2023
  • [10] Lessons Learned Framework for Efficient Delivery of Construction Projects in Saudi Arabia
    AlMunifi, Abdullatif A.
    Almutairi, Saud
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2021, 21 (04): : 115 - 141