Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia

被引:26
|
作者
Abdellatif, Hussein [1 ]
Alshibani, Adel [2 ]
机构
[1] KFUPM, Elect Engn Dept, Dhahran 31261, Saudi Arabia
[2] KFUPM, Construct Engn & Management, Dhahran 31261, Saudi Arabia
关键词
industrial projects; delay factors; scheduling; RII; building projects; RESOURCE-BASED THEORY; CONSTRUCTION PROJECTS; COST; ORGANIZATION; ECONOMICS; OVERRUNS; INDUSTRY; RANKING; MODEL; RISK;
D O I
10.3390/buildings9040093
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There have been many studies done on the causes of delay on construction projects and building projects all around the world. They use different methods, on different geographical areas, and they come up with different results. There are, however, few studies on industrial and building projects. This paper focuses on industrial/manufacturing projects in Saudi Arabia. The aim of this paper is to identify the major causes of delay in the manufacturing projects in Saudi Arabia. The top causes of delay have been identified through a literature survey and interviews with experts from the industrial field in Saudi Arabia. Twenty-two factors have been identified and listed in a survey that was distributed to professionals in the same field. Two categorizations were made: the first is based on the impact of the cause, and the second is based on the frequency of occurrence of the identified cause. It has been found that the top five impacted causes of delay in the delivery of industrial projects in Saudi Arabia are: difficulties in financing project by contractor/manufacturer, late procurement of materials, late delivery of materials, delay in progress payments, and delay in approving design documents, respectively. In terms of frequency, the top five identified causes are: delay in progress payments, difficulties in financing project by contractor/manufacturer, slowness in decision making, late procurement of materials, and delay in approving design documents, respectively. The diversity of the participants is an important point; therefore, the respondents were from different job positions (management, engineering, etc.), and different categories (contractor, owner, manufacturer, consultant, etc.). It is worth noting that this paper serves not only as an authentic study of the causes of delay in the delivery of industrial projects in Saudi Arabia which is a field that is not widely covered, but also as a fresh paper that gives an indication of the changes that happen to the business over time as compared to previous work.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] Major Factors Controlling the Elemental Composition of Al-Kharrar Lagoon Bottom Sediments, Rabigh, Saudi Arabia
    Ghandour, Ibrahim M.
    Mannaa, Ammar
    Alharbi, Omar
    Masoud, Alaa A.
    Aljahdali, Mohammed H.
    [J]. MINERALS, 2022, 12 (09)
  • [42] The Analysis of Major Risk Factors and Countermeasures of the Building Process of Large-scale Hydropower Projects
    WangJianPing
    LiZhi
    ZhengXiaZhong
    [J]. 2011 INTERNATIONAL CONFERENCE ON APPLIED SOCIAL SCIENCE (ICASS 2011), VOL III, 2011, : 81 - +
  • [43] Statistical Analysis of Delay-Causing Factors in Indian Highway Construction Projects under Hybrid Annuity Model
    Sharma, Kamal
    Trivedi, Manoj Kumar
    [J]. TRANSPORTATION RESEARCH RECORD, 2023, 2677 (10) : 572 - 591
  • [44] A Qualitative Analysis of Social-Ecological Factors Shaping Childhood Immunisation Hesitancy and Delay in the Eastern Province of Saudi Arabia
    Alabadi, Marwa
    Pitt, Victoria
    Aldawood, Zakariya
    [J]. VACCINES, 2023, 11 (09)
  • [45] The impact of patients' gender and cultural factors on pre-hospital delay among myocardial infarction patients in Saudi Arabia
    Alshahrani, H.
    Fitzsimons, D.
    Mcconkey, R.
    Wilson, J.
    Youssef, M.
    [J]. EUROPEAN JOURNAL OF CARDIOVASCULAR NURSING, 2013, 12 : S15 - S15
  • [46] Effect of meteorological factors on the COVID-19 cases: a case study related to three major cities of the Kingdom of Saudi Arabia
    Iqbal, Anam
    Haq, Wajiha
    Mahmood, Tahir
    Raza, Syed Hassan
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (15) : 21811 - 21825
  • [47] Effect of meteorological factors on the COVID-19 cases: a case study related to three major cities of the Kingdom of Saudi Arabia
    Anam Iqbal
    Wajiha Haq
    Tahir Mahmood
    Syed Hassan Raza
    [J]. Environmental Science and Pollution Research, 2022, 29 : 21811 - 21825
  • [48] The Lack of Techniques Used in Management as a Factor Causing Delays in Construction Projects in B&H and Other Delay Factors Detected
    El Sayed, Ahmed
    Mamoua, Emad
    Novalic, Adnan
    [J]. NEW TECHNOLOGIES, DEVELOPMENT AND APPLICATION II, 2020, 76 : 728 - 735
  • [49] Factors influencing consumers' continued use of food delivery apps in the post-pandemic era: insights from Saudi Arabia
    Abed, Salma S.
    [J]. BRITISH FOOD JOURNAL, 2024, 126 (05): : 2041 - 2060
  • [50] Historical flood imprints reveal factors causing catastrophic impacts on modern Jeddah, Saudi Arabia: a case of flash floods versus rapid urbanization
    Zaigham N.A.
    Mahar G.A.
    Aburizaiza O.S.
    Nayyar Z.A.
    [J]. Arabian Journal of Geosciences, 2021, 14 (5)