Delayed Payment Problems in Public Construction Projects: Subcontractors' Perspectives

被引:0
|
作者
Enshassi, Adnan [1 ]
Abuhamra, Lina [1 ]
机构
[1] Islamic Univ Gaza, Dept Civil Engn, Gaza, Israel
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The problem of the contractors and sub-contractors cash flow is mainly due to delayed payment and nonpayment which can severely affect the implementation and performance of any project. The objectives of this study are to identify the causes of delayed payment and nonpayment issues in construction projects in Gaza Strip from subcontractors' perspective; to study the reaction of subcontractors towards payment problems; and to study the subcontractors' opinion on effective remedies to delayed payments. A questionnaire survey was adopted to elicit the perception of subcontractors concerning payment problems. The findings of this study indicated that most subcontractors encountered delayed payment and nonpayment from the main contractors. Delayed variation orders payment was found as the most frequently problem faced by subcontractors which has led to disputes. The results revealed that most disputes were resolved through negotiation. The average time that was taken to resolve the disputes was less than 3 months. The findings showed that the inclusion of the arbitration clause in the contract is the most important effective remedy to solve the payment and dispute issues in construction projects in Gaza Strip. The findings from this study would be valuable for all construction professionals.
引用
收藏
页码:567 / 575
页数:9
相关论文
共 50 条
  • [41] Beyond the Iron Triangle in Public Construction Projects
    Tabish, Syed Zafar Shahid
    Jha, Kumar Neeraj
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (08)
  • [42] Productivity Measurement and Improvement for Public Construction Projects
    Zhan, Wenting
    Pan, Wei
    Hao, Gang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (06)
  • [43] Causes of delay in Saudi public construction projects
    Alsuliman, Jawad A.
    ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (02) : 801 - 808
  • [44] Managing the Development & Construction of Public Hospital Projects
    Ling, Florence Yean Yng
    Li, Qian
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [45] Important Factors for Success of Public Construction Projects
    Tabishl, S. Z. S.
    Jha, K. N.
    CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011, 2011, 15 : 64 - 68
  • [46] Improving Performance in Construction Projects: A Case Study of Malaysian Public Projects
    Yusof, Aminah Md
    Khoso, Ali Raza
    Sohu, Samiullah
    Khahro, Shabir Hussain
    Chai, Chang Saar
    PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 29 (04): : 2579 - 2604
  • [47] An Econometric Analysis of Holdup Problems in Construction Projects
    Chang, Chen-Yu
    Qian, Yaming
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (06)
  • [48] Critical success factors in the management of petrochemical construction projects for contractors and subcontractors during the COVID-19 pandemic
    Artpairin, Angkarn
    Pinmanee, Saichon
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (11) : 1956 - 1968
  • [49] Effects of Payment Delays at Two Links in Payment Chains on the Progress of Construction Projects: System Dynamic Modeling and Simulation
    Xie, Hongtao
    Zheng, Junwei
    Zhang, Yunhua
    Li, Hongyang
    SUSTAINABILITY, 2019, 11 (15)
  • [50] CORRECT ACCOUNTING PRINCIPLES IN CONNECTION WITH THE PAYMENT OF CONSTRUCTION COSTS ON FEDERAL IRRIGATION PROJECTS
    Hauter, L. H.
    JOURNAL OF FARM ECONOMICS, 1932, 14 (04): : 687 - 690