Delayed Payment Problems in Public Construction Projects: Subcontractors' Perspectives

被引:0
|
作者
Enshassi, Adnan [1 ]
Abuhamra, Lina [1 ]
机构
[1] Islamic Univ Gaza, Dept Civil Engn, Gaza, Israel
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The problem of the contractors and sub-contractors cash flow is mainly due to delayed payment and nonpayment which can severely affect the implementation and performance of any project. The objectives of this study are to identify the causes of delayed payment and nonpayment issues in construction projects in Gaza Strip from subcontractors' perspective; to study the reaction of subcontractors towards payment problems; and to study the subcontractors' opinion on effective remedies to delayed payments. A questionnaire survey was adopted to elicit the perception of subcontractors concerning payment problems. The findings of this study indicated that most subcontractors encountered delayed payment and nonpayment from the main contractors. Delayed variation orders payment was found as the most frequently problem faced by subcontractors which has led to disputes. The results revealed that most disputes were resolved through negotiation. The average time that was taken to resolve the disputes was less than 3 months. The findings showed that the inclusion of the arbitration clause in the contract is the most important effective remedy to solve the payment and dispute issues in construction projects in Gaza Strip. The findings from this study would be valuable for all construction professionals.
引用
收藏
页码:567 / 575
页数:9
相关论文
共 50 条
  • [31] Design-Construction Interface Problems in Sustainable Construction Projects
    Al Qasem, Dana
    El-Sayegh, Sameh M.
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2025, 31 (01)
  • [32] Effect of systematic completion on public construction projects
    Beste, Teresa
    FACILITIES, 2021, 39 (3-4) : 156 - 171
  • [33] SURETY BONDS ON PUBLIC AND PRIVATE CONSTRUCTION PROJECTS
    CUSHMAN, EH
    AMERICAN BAR ASSOCIATION JOURNAL, 1960, 46 (06): : 649 - 654
  • [34] Assessing the adequacy of competition in public construction projects
    Hyari, Khaled Hesham
    Thneibat, Mujahed
    CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [35] Computer images: Visualisation of public construction projects
    Emery, M
    ARCHITECTURE D AUJOURD HUI, 1999, 321 : 119 - 119
  • [36] Cost development in Norwegian public construction projects
    Danielsen, Daniel Andre
    Torp, Olav
    Engebo, Atle
    Laedre, Ola
    Lohne, Jardar
    PROCEEDINGS OF THE 9TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2017, : 79 - 92
  • [37] Responsibility mechanism for agent construction of public projects
    Zhang, Wei
    Zhu, Hongliang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2008, 41 (12): : 103 - 107
  • [38] Causes of Delay in Public Construction Projects in Iraq
    Bekr, Ghanim A.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2015, 9 (02) : 149 - 162
  • [39] Measuring Corruption in Public Construction Projects in China
    Shan, Ming
    Chan, Albert P. C.
    Le, Yun
    Xia, Bo
    Hu, Yi
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2015, 141 (04)
  • [40] Procurement routes in public building and construction projects
    Lædre, O
    Austeng, K
    Haugen, TI
    Klakegg, OJ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (07): : 689 - 696