The unsolicited proposal and performance of private participation infrastructure projects in developing countries

被引:0
|
作者
Ayat, Muhammad [1 ]
Lilah, Azmat [2 ]
Kang, Changwook [1 ]
机构
[1] Hanyang Univ, Dept Ind & Management Engn, ERICA Campus, Ansan, South Korea
[2] Hainan Univ, Management Sch, Haikou, Hainan, Peoples R China
关键词
Control of corruption; Local firm; PPI projects; Project size; Unsolicited proposal; LOGISTIC-REGRESSION; CORRUPTION; DISTANCE; RISK; PRIVATIZATION; INSTITUTIONS; MANAGEMENT; SURVIVAL; MODEL;
D O I
10.1108/JEDT-12-2021-0730
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries. Design/methodology/approach The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP). Findings The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors' expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%. Originality/value This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.
引用
收藏
页码:901 / 925
页数:25
相关论文
共 50 条
  • [21] Model for predicting the success of public-private partnership infrastructure projects in developing countries: a case of Ghana
    Osei-Kyei, Robert
    Chan, Albert P. C.
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2019, 15 (03) : 213 - 232
  • [22] PEOPLES PARTICIPATION IN ENVIRONMENTAL PROJECTS IN DEVELOPING-COUNTRIES
    DRIJVER, CA
    LANDSCAPE AND URBAN PLANNING, 1991, 20 (1-3) : 129 - 139
  • [23] Challenges, drivers and incentives to private sector participation in public-private partnership projects in developing countries: evidence from Zambia
    Zulu, Ephraim
    Mutwale, Josephine
    Zulu, Sambo Lyson
    Musonda, Innocent
    Kavishe, Neema
    Moobela, Cletus
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023,
  • [24] Financial Additionality of Multilateral Development Banks in Private Participation in Infrastructure Projects
    Taguchi, Hiroyuki
    Yasumura, Kota
    SUSTAINABILITY, 2021, 13 (15)
  • [25] A Fuzzy Approach for the Allocation of Risks in Public-Private Partnership Water-Infrastructure Projects in Developing Countries
    Ameyaw, Ernest Effah
    Chan, Albert P. C.
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2016, 22 (03)
  • [26] A decision making model for infrastructure projects selection in developing countries
    Mawdesley, M.
    Hernandez, O.
    Al-Jibouri, S.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2005, 10 (03) : 135 - 145
  • [27] Feasibility of implementing IPD approach for infrastructure projects in developing countries
    Khanna M.
    Elghaish F.
    McIlwaine S.
    Brooks T.
    Journal of Information Technology in Construction, 2021, 26 : 902 - 921
  • [28] FEASIBILITY OF IMPLEMENTING IPD APPROACH FOR INFRASTRUCTURE PROJECTS IN DEVELOPING COUNTRIES
    Khanna, Manas
    Elghaish, Faris Faris
    McIlwaine, Stephen
    Brooks, Tara
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2021, 26 : 902 - 921
  • [29] The Role of Institutions in Private Participation in Infrastructure in Low- and Middle-income Countries: Greenfield versus Brownfield Projects
    Taguchi, Hiroyuki
    Sunouchi, Yasushi
    ECONOMICS BULLETIN, 2019, 39 (03): : 2027 - +
  • [30] An Infrastructure for Implementing e-Participation Services in Developing Countries
    Miah, Shah Jahan
    Gammack, John
    Greenfield, Geoffrey
    2009 3RD IEEE INTERNATIONAL CONFERENCE ON DIGITAL ECOSYSTEMS AND TECHNOLOGIES, 2009, : 598 - +