Design of Cutting Depth of Artificial Dam of Underground Reservoir in Wulanmulun Mine

被引:1
|
作者
Kong, Xiang-song [1 ,2 ]
Fang, Jie [1 ,2 ]
Xu, Zhuang-zhuang [2 ]
Wang, Shuan [2 ]
Liu, Shuai [2 ]
机构
[1] China Energy Investment Corp Ltd, State Key Lab Water Resource Protect & Utilizat C, Beijing 100011, Peoples R China
[2] China Univ Min & Technol Beij Ing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
关键词
D O I
10.1088/1755-1315/330/3/032088
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Rich in coal and lack of water is a remarkable characteristic of mining area in western China. The water storage technology of underground reservoir has become an important means of water resources protection in mining area of western China, and the cutting depth of artificial dam plays an important role in the design of underground reservoir. In order to study the influence of cutting depth of artificial dam on the stability of underground reservoir, the MB-1 dam of No. 2 reservoir in Wulanmulun mine is selected as the research object. The 3D calculation model is established by using FLAC3D, and several calculation schemes are made by changing the cutting depth of side, roof and floor, respectively. Then the influence of cutting depth of artificial dam on the stability of mine underground reservoir is deeply analyzed from the aspects of displacement field and stress field. The results show that the optimum cutting depths of MB-1 artificial dam in side, roof and floor are 0.6m, 0.5m and 0.4m, respectively.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] Design and underground construction at the Xiaolangdi Multipurpose Dam site
    Wang, X
    Solymar, ZV
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1997, 12 (04) : 461 - 472
  • [42] Synchronizing Artificial Intelligence Models for Operating the Dam and Reservoir System
    Allawi, Mohammed Falah
    Jaafar, Oilman
    Ehteram, Mohammad
    Hamzah, Firdaus Mohamad
    El-Shafie, Ahmed
    [J]. WATER RESOURCES MANAGEMENT, 2018, 32 (10) : 3373 - 3389
  • [43] Creep behavior and permeability evolution of coal pillar dam for underground water reservoir
    Yulong Chen
    Xianjie Hao
    Dongjie Xue
    Zhe Li
    Xiaoran Ma
    [J]. International Journal of Coal Science & Technology, 2023, 10
  • [44] The Detection and Analysis of Reservoir Dam Crack Depth and Grouting Quality Analysis
    Zhang, Jinyang
    Gao, Xiu
    [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 3329 - 3332
  • [45] Creep behavior and permeability evolution of coal pillar dam for underground water reservoir
    Chen, Yulong
    Hao, Xianjie
    Xue, Dongjie
    Li, Zhe
    Ma, Xiaoran
    [J]. INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2023, 10 (01)
  • [46] Investigation of plunging depth and density currents in eǧrekkaya dam reservoir
    Üneş, Fatih
    Varçtn, Hakan
    [J]. Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2012, 23 (01): : 5725 - 5750
  • [47] Underground Mine Workings Convergence Dependence on Operation Time and Location Depth
    Toderas, M.
    Moraru, R. I.
    Popescu-Stelea, M.
    [J]. JOURNAL OF MINING SCIENCE, 2015, 51 (03) : 541 - 552
  • [48] Underground mine workings convergence dependence on operation time and location depth
    M. Toderaş
    R. I. Moraru
    M. Popescu-Stelea
    [J]. Journal of Mining Science, 2015, 51 : 541 - 552
  • [49] Artificial Neural Network and Support Vector Machine Models for Inflow Prediction of Dam Reservoir (Case Study: Zayandehroud Dam Reservoir)
    Babaei, Mohammad
    Moeini, Ramtin
    Ehsanzadeh, Eghbal
    [J]. WATER RESOURCES MANAGEMENT, 2019, 33 (06) : 2203 - 2218
  • [50] Artificial Neural Network and Support Vector Machine Models for Inflow Prediction of Dam Reservoir (Case Study: Zayandehroud Dam Reservoir)
    Mohammad Babaei
    Ramtin Moeini
    Eghbal Ehsanzadeh
    [J]. Water Resources Management, 2019, 33 : 2203 - 2218