Design of Cutting Depth of Artificial Dam of Underground Reservoir in Wulanmulun Mine

被引:1
|
作者
Kong, Xiang-song [1 ,2 ]
Fang, Jie [1 ,2 ]
Xu, Zhuang-zhuang [2 ]
Wang, Shuan [2 ]
Liu, Shuai [2 ]
机构
[1] China Energy Investment Corp Ltd, State Key Lab Water Resource Protect & Utilizat C, Beijing 100011, Peoples R China
[2] China Univ Min & Technol Beij Ing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
关键词
D O I
10.1088/1755-1315/330/3/032088
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Rich in coal and lack of water is a remarkable characteristic of mining area in western China. The water storage technology of underground reservoir has become an important means of water resources protection in mining area of western China, and the cutting depth of artificial dam plays an important role in the design of underground reservoir. In order to study the influence of cutting depth of artificial dam on the stability of underground reservoir, the MB-1 dam of No. 2 reservoir in Wulanmulun mine is selected as the research object. The 3D calculation model is established by using FLAC3D, and several calculation schemes are made by changing the cutting depth of side, roof and floor, respectively. Then the influence of cutting depth of artificial dam on the stability of mine underground reservoir is deeply analyzed from the aspects of displacement field and stress field. The results show that the optimum cutting depths of MB-1 artificial dam in side, roof and floor are 0.6m, 0.5m and 0.4m, respectively.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] A MODEL FOR UNDERGROUND COAL-MINE DESIGN
    LINEBERRY, GT
    ADLER, L
    [J]. PROCEEDINGS : 1989 MULTINATIONAL CONFERENCE ON MINE PLANNING AND DESIGN, 1989, : 59 - 69
  • [32] Virtual mine design paradigm for underground mining
    Hladysz, ZJ
    [J]. MINING IN THE NEW MILLENNIUM CHALLENGES AND OPPORTUNITIES, 2000, : 263 - 276
  • [33] Underground mine design and planning: Complexity and interdependencies
    Morin, MA
    [J]. MINERAL RESOURCES ENGINEERING, 2002, 11 (02): : 197 - 215
  • [34] Simulation benefits underground mine infrastructure design
    Lebedev, Alex
    Staples, Phil
    [J]. Bulk Solids Handling, 2000, 20 (02): : 191 - 196
  • [35] Preliminary Design and On-Site Testing Methodology of Roof-Cutting for Entry Retaining in Underground Coal Mine
    Chen, Ying
    Zhang, Zikai
    Bao, Shiji
    Yang, Hongtao
    Shi, Mingzhe
    Cao, Chen
    [J]. SENSORS, 2023, 23 (14)
  • [36] PRELIMINARY SUPPORT DESIGN FOR UNDERGROUND MINE ADIT, ARTANA MINE, KOSOVO
    Zeqiri, Kemajl
    Ibishi, Gzim
    Shabani, Musa
    Kortnik, Joze
    Bilir, Mehmet Erdinc
    Genis, Melih
    Yavuz, Mahmut
    Hetemi, Muhamedin
    Bacak, Gurkan
    [J]. MINING SCIENCE, 2021, 28 (28) : 141 - 159
  • [37] Preliminary design of an underground reservoir for pumped storage
    Nasim Uddin
    M. Asce
    [J]. Geotechnical & Geological Engineering, 2003, 21 (4) : 331 - 355
  • [38] Moving Towards Accurate Monitoring and Prediction of Gold Mine Underground Dam Levels
    Hasan, Ali N.
    Twala, Bhekisipho
    Marwala, Tshilidzi
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS (IJCNN), 2014, : 2837 - 2842
  • [39] Synchronizing Artificial Intelligence Models for Operating the Dam and Reservoir System
    Mohammed Falah Allawi
    Othman Jaafar
    Mohammad Ehteram
    Firdaus Mohamad Hamzah
    Ahmed El-Shafie
    [J]. Water Resources Management, 2018, 32 : 3373 - 3389
  • [40] Olympic Dam Operation - An overview of underground design and planning
    Uggalla, S
    [J]. 10TH AUSTRALIAN TUNNELLING CONFERENCE - THE RACE FOR SPACE: PROCEEDINGS, 1999, 99 (02): : 127 - 132