Gust response of a prestressed concrete cable-stayed bridge under cantilever construction

被引:0
|
作者
Niihara, Y [1 ]
Nakano, R [1 ]
Hayashida, K [1 ]
机构
[1] Kajima Tech Res Inst, Tokyo, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A concrete cable-stayed bridge constructed by the cantilever construction method is structurally unstable and the gust response of the deck is unavoidable. In this study, gust response analyses of a long spanned concrete cable-stayed bridge during cantilever erection was performed in both a frequency and a time domain analysis using the results of a full scale measurement and the structural safety of the bridge was discussed.
引用
收藏
页码:1461 / 1464
页数:4
相关论文
共 50 条
  • [41] Buffeting Response of Cable-Stayed Bridge during Construction under Skew Winds and Pylon Interference
    Bin Jian
    Yi Su
    Mingshui Li
    KSCE Journal of Civil Engineering, 2020, 24 : 2971 - 2979
  • [42] The influence of asymmetrical cantilever construction on low pylon cable-stayed bridge of the long span railway
    Guo Weiqiang
    Chen Quan
    2018 4TH INTERNATIONAL CONFERENCE ON SYSTEMS, COMPUTING, AND BIG DATA (ICSCBD 2018), 2019, : 168 - 173
  • [43] Finite element numerical simulation of a cable-stayed bridge construction through the progressive cantilever method
    Hoffman, Igor Souza
    Lazzari, Bruna Manica
    Campos, Americo
    Lazzari, Paula Manica
    Pacheco, Alexandre Rodrigues
    STRUCTURAL CONCRETE, 2022, 23 (02) : 632 - 651
  • [44] Analysis of cable-stayed bridges during construction by cantilever methods
    Wang, PH
    Tang, TY
    Zheng, HN
    COMPUTERS & STRUCTURES, 2004, 82 (4-5) : 329 - 346
  • [45] Structural Analysis of the Cantilever Construction Process in Cable-Stayed Bridges
    Pipinato, Alessio
    Pellegrino, Carlo
    Modena, Claudio
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2012, 56 (02): : 141 - 166
  • [46] Study of Buffeting Response and Suppression Measures for Composite Girder Cable-Stayed Bridge in Longest Cantilever State During Construction
    Hu, Xu-Hui
    Yang, Shen-Yun
    Li, Yu-Lin
    Wang, Qi
    Bridge Construction, 2021, 51 (01) : 21 - 28
  • [47] Cantilever Construction Optimization of Cable-stayed Bridge with Hybrid Bridge Deck System and Building Materials in Civil Engineering
    Dai Yuwen
    Wang Youyuan
    Li Zhixue
    ADVANCED RESEARCH ON CIVIL ENGINEERING AND MATERIAL ENGINEERING, 2012, 568 : 107 - +
  • [48] Design and construction of a launched cable-stayed bridge in China
    Wang, Yingliang
    Dai, Xiaochun
    He, Tingguo
    Dai, Jianbing
    Zhang, Jiachun
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (05) : 3 - 8
  • [49] Static Analysis of Cable-Stayed Suspension Bridge under Concrete Shrinkage and Creep
    Xia, Guoping
    Zhang, Zhe
    MANUFACTURING PROCESS TECHNOLOGY, PTS 1-5, 2011, 189-193 : 4409 - +
  • [50] Monitoring of the Alamillo cable-stayed bridge during construction
    J. R. Casas
    A. C. Aparicio
    Experimental Mechanics, 1998, 38 : 24 - 28