Cantilever Construction Optimization of Cable-stayed Bridge with Hybrid Bridge Deck System and Building Materials in Civil Engineering

被引:1
|
作者
Dai Yuwen [1 ,2 ]
Wang Youyuan [2 ]
Li Zhixue [2 ]
机构
[1] S China Univ Technol, Guangzhou, Guangdong, Peoples R China
[2] CCCC Forth Harbor Engn Co LTD, Engn Technol Res Co LTD, Shanghai, Peoples R China
关键词
Orthotropic steel deck system; Composite beam deck system; Hybrid bridge deck system; Cable-stayed bridge; Building materials;
D O I
10.4028/www.scientific.net/AMR.568.107
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes the basic characteristics of the hybrid bridge deck system made up of two building materials include orthotropic steel deck system and the composite beam deck system, and the problem of excessive horizontal displacement on the bridge tow in cantilever construction as the different weight of the steel bridge deck panel and concrete one. Based on the self-balancing and self-anchoring principle of cable-stayed bridge, two optimizing methods of that adding weight or bridge deck paving after main beam enclosing, were proposed. Numerical simulation of the conventional construction procedure of Beijiang Bridge in Guizhou-Guangzhou Railway was carried out compared with the optimizing procedures proposed. The results show that the max horizontal displacement on the bridge tow is 12.5 cm in the construction period of normal procedure of cantilever construction, which is about 2 cm with the optimizing procedures proposed. Cantilever construction optimization eliminates the hidden dangers by excessive horizontal displacement of the bridge tow, and put forwards a reasonable construction program.
引用
收藏
页码:107 / +
页数:2
相关论文
共 50 条
  • [1] Optimization of cantilever construction of cable-stayed bridge with hybrid deck system
    Dai, Yu-Wen
    Wang, You-Yuan
    He, Jin-Ming
    [J]. Bridge Construction, 2014, 44 (04) : 117 - 121
  • [2] El Carrizo bridge - Cantilever construction of a cable-stayed bridge launching girders deck using
    Trotin, Nicolas
    Ladret, Patrick
    del Olmo, Sergio
    [J]. HORMIGON Y ACERO, 2015, 66 (275): : 69 - 83
  • [3] Construction of the hybrid cable-stayed bridge
    Kim, D. G.
    Kwon, H. C.
    Lee, K. J.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 3328 - 3333
  • [4] Direct simulation of the tensioning process of cable-stayed bridge cantilever construction
    Farre-Checa, J.
    Komarizadehasl, S.
    Ma, Haiying
    Lozano-Galant, J. A.
    Turmo, J.
    [J]. AUTOMATION IN CONSTRUCTION, 2022, 137
  • [5] Construction Engineering of Phu My Cable-Stayed Bridge, Vietnam
    Moir, George
    Edmonds, Cohn
    Romberg, Martin
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2010, 20 (03) : 331 - 337
  • [6] Modal identification of stays and deck of a cable-stayed bridge
    Argentini, T.
    Belloli, M.
    Rosa, L.
    Sabbioni, E.
    Villani, M.
    [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON NOISE AND VIBRATION ENGINEERING (ISMA2012) / INTERNATIONAL CONFERENCE ON UNCERTAINTY IN STRUCTURAL DYNAMICS (USD2012), 2012, : 1031 - 1043
  • [7] Queensferry Crossing, UK: cable-stayed bridge deck and cables - design and construction
    Curran, Peter
    Platt, Alan
    Vasquez, Antonio
    Baralos, Paul
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (02) : 135 - 144
  • [8] Simulation of cantilever-casting construction of prestressed concrete cable-stayed bridge
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    [J]. Huazhong Ligong Daxue Xuebao, 2008, 4 (115-118):
  • [9] CABLE-STAYED BRIDGE LOADS CAUSED BY TRAFFIC CONGESTION ON THE DECK MEASURED WITH BRIDGE MONITORING SYSTEM
    Machelski, Czeslaw
    Hildebrand, Maciej
    [J]. BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2021, 16 (02): : 66 - 89
  • [10] Bridge management system development for a cable-stayed bridge
    Sungkon Kim
    [J]. KSCE Journal of Civil Engineering, 2001, 5 (1) : 43 - 49