共 50 条
- [41] Prediction model of Passenger Waiting Time in High-speed Rail Hub Based on BP Neural Network [J]. MECHATRONICS AND INDUSTRIAL INFORMATICS, PTS 1-4, 2013, 321-324 : 1903 - 1906
- [45] Review of research on high-speed railway subgrade settlement in soft soil area [J]. Railway Engineering Science, 2020, 28 : 129 - 145
- [46] Research on Method of Layout Optimization for High-speed Railway Infrastructure Depot [J]. Tiedao Xuebao/Journal of the China Railway Society, 2021, 43 (01): : 10 - 18
- [47] Schedule-Based Passenger Flow Assignment Decomposition Method for High-Speed Railway Networks [J]. Zhongguo Tiedao Kexue/China Railway Science, 2020, 41 (06): : 164 - 175
- [49] Design method of rail grinding profile in frog area of high-speed railway [J]. Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2021, 21 (06): : 124 - 135
- [50] Prediction Model of High-Speed Railway's Passenger Flow Seat Structure Based on Improved LSTM [J]. CICTP 2022: INTELLIGENT, GREEN, AND CONNECTED TRANSPORTATION, 2022, : 1024 - 1033