An impact imaging method for monitoring on construction of immersed tube tunnel foundation treated by sand-filling method

被引:11
|
作者
Che, Ailan [1 ]
Zhu, Renjie [1 ]
Fan, Yanmin [1 ]
Feng, Shaokong [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, 800 Dongchuan Rd, Shanghai 200240, Peoples R China
基金
国家重点研发计划;
关键词
Immersed tube tunnel; P-wave impact imaging method (PII); Real-time monitoring; Full scale model test; Sand-filling method; SETTLEMENTS;
D O I
10.1016/j.tust.2018.11.027
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Sand filling method (sand-flow method) is widely used in the treatment of immersed tube tunnel foundation, but quick and reliable method for real-time monitoring on the formation of sand-deposit and the connection of sand deposit between neighboring sand filling hole is absent. In this paper, a full-scale model of immersed tube tunnel foundation treated by sand filling method was conducted. The case was simplified as a multi-layered media problem, and a nondestructive testing method based on P-wave was explored to control the sand filling time in different hole. Through model testing, the relationship between the change rate of P-wave response energy and the radius of the sand-deposit is established. Kriging interpolation principle was employed to make a complete evaluation of the sand-deposit. The radius of sand-deposit measured by the P-wave impact imaging method (PII) agree well with the average radius observed by the observation window. Comparing the results of PII in sand filling hole with the relative compactedness of sand foundation after the sand filling, it can be found that the sand foundation boundary detected by PII method agree well with model test result, and the region with higher relative compactedness has a good correspondence with the regions with high change rate of PII. So, the PII method can detect the radius and the distribution of relative compactedness of sand-deposit. Because the method is convenient in calculation, the construction of sand filling foundation can be monitored in real time by PII method. In conclusion, the method can be used to monitor sand-filling treatment in immersed tube tunnel on real-time, and provide a scientific basis for the design and construction of immersed tube tunnel Engineering.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [1] Spatiotemporal Monitoring and Evaluation Method for Sand-Filling of Immersed Tube Tunnel Foundation
    Wu, Peng
    Che, Ailan
    APPLIED SCIENCES-BASEL, 2021, 11 (03): : 1 - 18
  • [2] Model test of immersed tube tunnel foundation treated by sand-flow method
    Li, Wei
    Fang, Yingguang
    Mo, Haihong
    Gu, Renguo
    Chen, Junsheng
    Wang, Yizhao
    Feng, Deluan
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 40 : 102 - 108
  • [3] Experiment and analysis of law of sand deposit expansion in foundation of immersed tube tunnel treated by sand flow method
    Fang, Yingguang
    Li, Wei
    Mo, Haihong
    Gu, Renguo
    Chen, Junsheng
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2012, 31 (01): : 206 - 216
  • [4] Sand filling process monitoring and filling status evaluation of immersed tunnel foundation
    Xu Z.
    Che A.
    Zhou H.
    Yuan G.
    Han Z.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2023, 42 (24): : 204 - 211
  • [5] Formation of sand deposit in the process of foundation treatment by sand flow method for immersed tunnel
    Li, Yadong
    Mo, Haihong
    Chen, Junsheng
    Li, Wei
    Electronic Journal of Geotechnical Engineering, 2013, 18 Q : 3625 - 3636
  • [6] Sand Deposit Arrangement and Construction Optimization for Large-section Immersed Tube Tunnel Foundations via the Sand Flow Method
    Li, Ya-dong
    Cui, Jie
    Mo, Hai-hong
    Li, Wei
    Yuan, Jie
    SOIL MECHANICS AND FOUNDATION ENGINEERING, 2017, 54 (05) : 324 - 329
  • [7] Sand Deposit Arrangement and Construction Optimization for Large-section Immersed Tube Tunnel Foundations via the Sand Flow Method
    Ya-dong Li
    Jie Cui
    Hai-hong Mo
    Wei Li
    Jie Yuan
    Soil Mechanics and Foundation Engineering, 2017, 54 : 324 - 329
  • [8] Construction of a testing and monitoring system in the hauling of immersed tube tunnel
    Guo, Q. (95207302@qq.com), 1606, Shanghai Jiaotong University (47):
  • [9] Evaluation of mud-jack method filling effect of immersed tube tunnel using surface wave survey method
    Che, Ai-Lan
    Huang, Xing-Chun
    Guo, Qiang
    Feng, Shao-Kong
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2011, 45 (05): : 648 - 652
  • [10] Seismic deformation method for the design of an immersed tube tunnel
    Vrettos, Ch
    Kolias, B.
    Panagiotakos, T.
    Richter, Th
    BAUINGENIEUR, 2010, 85 : 361 - 367