Analysing the Risk Propagation in the Project Portfolio Network using the SIRF Model

被引:6
|
作者
Zou, Xingqi [1 ]
Yang, Qing [1 ]
Wang, Qinru [1 ]
机构
[1] Univ Sci & Technol Beijing, Sch Econ & Management, 30 Xueyuan Rd, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
Portfolio Risk; SIRF (Susceptible-Infected-Recovered-Failed) Model; Risk Propagation; K-shell; Centrality of Eigenvectors; Link Entropy; IDENTIFICATION; METHODOLOGY;
D O I
10.5220/0010288102260232
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Due to the existence of dependencies among the projects, the risk in one project will cause risks in other projects, which will lead to the risk propagation in the portfolio network. To measure the criticality of projects in the portfolio considering risk propagation, the paper builds the risk analysis model using the complex network and SIRF model. Firstly, we build the network of the project portfolio based on the analysis of the independency among projects, then we propose the integrated project criticality measurement (IPCM) algorithm based on the complex network theory. The IPCM algorithm integrates the K-shell, eigenvector centrality and the neighbour nodes in the complex network to analyse the project criticality. Furthermore, the link entropy is used to calculate the influence of the project in the network. On this basis, combined with the practice of R&D project management, the SIRF (susceptible-infected-recovered-failed) model is proposed to analyse the dynamic propagation process of the risk in the project portfolio network. Then the priority ranking of the project portfolio is realized under the dynamic risk propagation. Finally, a representative example is provided to illustrate the validity of proposed models.
引用
收藏
页码:226 / 232
页数:7
相关论文
共 50 条
  • [31] Project selection in project portfolio management: An artificial neural network model based on critical success factors
    Costantino, Francesco
    Di Gravio, Giulio
    Nonino, Fabio
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (08) : 1744 - 1754
  • [32] Network origins of portfolio risk
    Zareei, Abalfazl
    JOURNAL OF BANKING & FINANCE, 2019, 109
  • [33] Evolution Mechanism of Project Portfolio Risk Based on Lotka-Voherra Model
    Guo, Ning
    Guo, Peng
    2016 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2016, : 2553 - 2557
  • [34] DEVELOPING A PROJECT PORTFOLIO SELECTION MODEL FOR CONTRACTOR FIRMS CONSIDERING THE RISK FACTOR
    Abbasianjahromi, Hamidreza
    Rajaie, Hossein
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (06) : 879 - 889
  • [35] Service provider portfolio selection for project management using a BP neural network
    Libiao Bai
    Kanyin Zheng
    Zhiguo Wang
    Jiale Liu
    Annals of Operations Research, 2022, 308 : 41 - 62
  • [36] Service provider portfolio selection for project management using a BP neural network
    Bai, Libiao
    Zheng, Kanyin
    Wang, Zhiguo
    Liu, Jiale
    ANNALS OF OPERATIONS RESEARCH, 2022, 308 (1-2) : 41 - 62
  • [37] Project systemic risk: Application examples of a network model
    Ellinas, Christos
    Allan, Neil
    Johansson, Anders
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 182 : 50 - 62
  • [38] The Project Risk Analysis Model based on Neural Network
    Dong Fugui
    Li Ning
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7440 - 7442
  • [39] Managing Underperformance Risk in Project Portfolio Selection
    Hall, Nicholas G.
    Long, Daniel Zhuoyu
    Qi, Jin
    Sim, Melvyn
    OPERATIONS RESEARCH, 2015, 63 (03) : 660 - 675
  • [40] Portfolio based approach to project risk management
    Nubbaurner, Manfred
    Nuebel, Konrad
    Proceedings of the 16th International Conference on Soil Mechanics and Geotechnical Engineering, Vols 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 2833 - 2836