Critical Risk Factors of Joint Venture Projects in the Oil and Gas Industry

被引:0
|
作者
Baradari, Fatemeh [1 ]
Nopiah, Zulkifli Mohd [2 ]
bin Ja'afar, Sabirin [3 ]
Dahlan, Wan Siti Adibah Wan [4 ]
机构
[1] Univ Kebangsaan Malaysia, Fac Engn & Built Environm, Ukm Bangi 43600, Selangor, Malaysia
[2] UKM, Fac Engn & Built Environm, Dept Engn Educ, Bangi 43600, Selangor, Malaysia
[3] Minist Home Affairs, Prevent Terrorism POTA Board, Pusat Pentadbiran Kerajaan Persekutuan, Putrajaya 62546, Malaysia
[4] Univ Kebangsaan Malaysia, Fac Law, Ukm Bangi 43600, Selangor, Malaysia
来源
JURNAL KEJURUTERAAN | 2021年 / 33卷 / 03期
关键词
Joint Venture Project (JVP); Malaysia; Oil and Gas (O&G); ThailandRisk Management;
D O I
10.17576/jkukm-2021-33(3)-07
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Oil and Gas (O&G) industry is one of the riskiest, most dynamic and challenging industries and plays a vital role in every nation's economy. Like any other major industry, O&G is exposed to a host of both predictable and unpredictable risks. Joint venture projects (JVP) are often regarded as a risky business as there is a high failure rate among them because of the complexities involved. This paper aims to identify the critical risk factors (CRFs) of JVPs for O&G between Malaysia and Thailand. Via systematic literature review (SLR) the risk factors for O&G and JVPs around the globe are identified and a set of questions relating to them were designed and used in a pilot study. A total of 15 respondents from different background e xperiences working in O &G JVPs were requested to answer the designed questionnaire during the pilot study. The questionnaire survey passed the required Cronbach Alpha value of 0.6 with a score of 0.98. The data collected involved 170 respondents currently working or have worked in O&G JVPs. The relative importance index (RII) for each risk factor's (RF) value was quantified and the RFs ranked based on the value. A RII value exceeding 60% is considered to have agreement and of importance to the respondents. The RII value can be used as an indicator to rank the RFs from the most to the least critical. The CRF categories determined in this study are environmental, cultural and social, and organisation. Under environmental, the main CRFs are losses due to fluctuation sin exchange rates/interest rates. For cultural and social, the main CRFs are problems associated with cultural differences and cooperation. Organisational issues related to organisational fit, incompetent project management team, difficulty in finding and keeping skilled workers, and low worker productivity. All the listed RFs underwent a comprehensive study on their impact and probability of occurrence to determine the best processes, methods, and tools for managing the risks. It is recommended that key players in the O&G industry consider all the RFs of JVPs during the risk management evaluation stage.
引用
收藏
页码:447 / 460
页数:14
相关论文
共 50 条
  • [21] Critical Success Factors of the Reliability-Centred Maintenance Implementation in the Oil and Gas Industry
    Zeinalnezhad, Masoomeh
    Chofreh, Abdoulmohammad Gholamzadeh
    Goni, Feybi Ariani
    Klemes, Jiri Jaromir
    SYMMETRY-BASEL, 2020, 12 (10):
  • [22] Key elements for the success of joint venture projects
    Lu, TJ
    PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 2300 - 2303
  • [23] IMPROVEMENT OF ECONOMIC EVALUATION OF INVESTMENT PROJECTS IN OIL AND GAS INDUSTRY
    Aprelova, A. V.
    JOURNAL OF MINING INSTITUTE, 2009, 181 : 190 - 192
  • [24] Investigation of contextual factors in shaping HR approaches and determining the success of international joint venture projects: Evidence from the Canadian telecom industry
    Drouin, Nathalie
    Bourgault, Mario
    Saunders, Susan Bartholomew
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (04) : 344 - 354
  • [25] Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan
    Akhund, Muhammad Akram
    Khoso, Ali Raza
    Pathan, Ashfaque Ahmed
    Imad, Hafiz Usama
    Siddiqui, Fida
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (04) : 3260 - 3264
  • [26] Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana
    Akunyumu, Stephen
    Fugar, Frank D. K.
    Adinyira, Emmanuel
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2025, 30 (01) : 111 - 136
  • [27] Risk management in oil and gas construction projects in Vietnam
    Nguyen Van Thuyet
    Ogunlana, Stephen O.
    Dey, Prasanta Kumar
    INTERNATIONAL JOURNAL OF ENERGY SECTOR MANAGEMENT, 2007, 1 (02) : 175 - 194
  • [28] Critical success factors influencing performance outcome of joint venture construction projects in South Africa: Comparison of first and second order models
    Mba, Marie Francoise Bekate
    Agumba, Justus Ngata
    CONSTRUCTION ECONOMICS AND BUILDING, 2018, 18 (03): : 74 - 94
  • [29] Critical factors for success in university-industry research projects
    Bernardos Barbolla, Ana M.
    Casar Corredera, Jose R.
    TECHNOLOGY ANALYSIS & STRATEGIC MANAGEMENT, 2009, 21 (05) : 599 - 616
  • [30] A hybrid model for ranking critical successful factors of Lean Six Sigma in the oil and gas industry
    Yazdi, Amir Karbassi
    Hanne, Thomas
    Osorio Gomez, Juan Carlos
    TQM JOURNAL, 2021, 33 (08): : 1825 - 1844