The ISM Analysis on Influence Factors of Cost Control in the Wind Power Construction Project

被引:6
|
作者
Wu Yunna [1 ]
Bian Qing [1 ]
Lin Ping [1 ]
机构
[1] N China Elect Power Univ, Sch Econ & Management, Beijing, Peoples R China
关键词
wind power construction project; cost control; interpretive structural modeling(ISM);
D O I
10.1016/j.phpro.2012.02.086
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cost control in the wind power construction project is essential under the trend of developing wind power in China. In order to carry out cost control effectively, structural interpretation model(ISM) is used to identify and analyze the major factors that affect the implementation of cost control and the hierarchy relationships between each other. In this way, the surface causes, the middle causes and the underlying causes that affect the cost control in the wind power construction project have been found, which provides decision theory for the smooth implementation of cost control in China's current wind power construction projects. (C) 2011 Published by Elsevier B.V. Selection and/or peer-review under responsibility of ICAPIE Organization Committee.
引用
收藏
页码:587 / 590
页数:4
相关论文
共 50 条
  • [31] Analysis of the Factors Affecting Construction Project Cost during COVID-19
    Adepu, Nikhitha
    Kermanshachi, Sharareh
    Pamidimukkala, Apurva
    Loganathan, Karthikeyan
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2023: TRANSPORTATION PLANNING, OPERATIONS, AND TRANSIT, 2023, : 718 - 727
  • [32] The Project Cost Control of China Thermal Power Project
    Lei Xueqin(Techno-economic Department
    Electricity, 1999, (02) : 41 - 43
  • [33] Study on Exceeding Budget Factors on Construction Project's Cost and Effective Control Strategy
    Li, Wei
    PROCEEDINGS OF THE 2017 7TH INTERNATIONAL CONFERENCE ON SOCIAL NETWORK, COMMUNICATION AND EDUCATION (SNCE 2017), 2017, 82 : 727 - 730
  • [34] Research on Construction Cost Control Technology of Construction Project Based on Big Data Analysis Theory
    Yu, Xiaobing
    Zuo, Hengzhong
    MOBILE INFORMATION SYSTEMS, 2022, 2022
  • [35] The analysis of power grid project risk based on ISM model
    Lu, Jianchang
    Pei, Leping
    INFORMATION SCIENCE AND MANAGEMENT ENGINEERING, VOLS 1-3, 2014, 46 : 2061 - 2065
  • [36] Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant
    Memon, Aftab Hameed
    Rahman, Ismail Abdul
    Abdullah, Mohd Razaki
    Azis, Ade Asmi Abdu
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2010, 1 (02): : 41 - 54
  • [37] Discussion on the analysis of lifecycle cost for construction project
    Sun, LX
    PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 2176 - 2179
  • [38] Joint Analysis of the Power Generation Construction Project Schedule, Cost and Quality Based on DEA
    Sun, Hongfei
    Zhou, Lanping
    Wang, Yanyan
    MATERIALS SCIENCE AND MECHANICAL ENGINEERING, 2014, 467 : 282 - 286
  • [39] The Risk Analysis and Evaluation of Project Construction Cost
    Cao, Duna
    Zhu, Binmei
    2011 INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION AND INDUSTRIAL APPLICATION (ICIA2011), VOL II, 2011, : 212 - 215
  • [40] Analysis and impact of construction environment on the project cost
    Yang, Wenjun
    Dou, Zhi
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2015), 2015, 27 : 1005 - 1010