Risk based urban watershed management under conflicting objectives

被引:0
|
作者
Novotny, V [1 ]
Clark, D [1 ]
Griffin, RJ [1 ]
Booth, D [1 ]
机构
[1] Marquette Univ, Inst Urban Environm Risk Management, Milwaukee, WI 53201 USA
关键词
urban flood control; ecological integrity; risk; risk communication; risk perception; willingness to pay; contingent valuation; public opinion surveys; theory of planned behaviour;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Ecological impairment and flooding caused by urbanization can be expressed numerically by calculating the risks throughout the watershed (floodplain) and along the main stems of the streams. The risks can be evaluated in terms of the present and/or future. This article describes the methodologies for ascertaining the risks in the Geographical Information Systems (GIS) environment. The objectives of urban flood controls and ecological preservation/restoration of urban waters are often conflicting and, in the past, the sole emphasis on flood control led to destruction of habitat and deterioration of water quality. An optimal solution to these two problems may be achieved by linking the risks to the concepts of risk communication, risk perception, and public willingness to pay for projects leading to ecological restoration and ecologically sustainable flood control. This method is appropriate because. in each case. public funds are used and the projects require approval and backing of policy makers and stakeholders. This article briefly describes a research project that attempts to resolve the conflict between the flood protection and stream ecological preservation and restoration and suggests alternative ways of expressing benefits of urban stream flood control and restoration projects.
引用
收藏
页码:69 / 78
页数:10
相关论文
共 50 条
  • [41] Modelling conflicting objectives in the management of a mobile ecological resource: Red deer in the Scottish Highlands
    Smart, James C. R.
    White, Piran C. L.
    Termansen, Mette
    [J]. ECOLOGICAL ECONOMICS, 2008, 64 (04) : 881 - 892
  • [42] An Optimization Method Based on Scenario Analysis for Watershed Management Under Uncertainty
    Yong Liu
    Huaicheng Guo
    Zhenxing Zhang
    Lijing Wang
    Yongli Dai
    Yingying Fan
    [J]. Environmental Management, 2007, 39 : 678 - 690
  • [43] Robustness Against the Decision-Maker's Attitude to Risk in Problems With Conflicting Objectives
    Bui, Lam T.
    Abbass, Hussein A.
    Barlow, Michael
    Bender, Axel
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2012, 16 (01) : 1 - 19
  • [44] Flood risk management in the Souss watershed
    Bouaakkaz, Brahim
    El Abidine El Morjani, Zine
    Bouchaou, Lhoussaine
    Elhimri, Hamza
    [J]. SIXTH INTERNATIONAL CONGRESS WATER, WASTE AND ENVIRONMENT (EDE6-2017): AFRICA, STATE OF PLAY AND FUTURE PROSPECTS, 2018, 37
  • [45] Optimal biomass allocation to the German bioeconomy based on conflicting economic and environmental objectives
    Musonda, Frazer
    Millinger, Markus
    Thran, Daniela
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 309
  • [46] Aligning compensation systems with risk management objectives
    Koenig, David R.
    [J]. PROCEEDINGS OF JOURNAL PUBLICATION MEETING (2007), 2007, : 10 - 13
  • [47] Aligning compensation systems with risk management objectives
    Koenig, David R.
    [J]. INTERNATIONAL CONFERENCE ON MANAGEMENT INNOVATION, VOLS 1 AND 2, 2007, : 30 - 33
  • [48] Food safety objectives aid in risk management
    Busta, F
    [J]. FOOD TECHNOLOGY, 2002, 56 (03) : 24 - 24
  • [49] Comparison of Stormwater Management Strategies with an Urban Watershed Model
    Hixon, Lee F.
    Dymond, Randel L.
    [J]. JOURNAL OF HYDROLOGIC ENGINEERING, 2015, 20 (09)
  • [50] Urban watershed flood mitigation planning and floodplain management
    Urbonas, BR
    Degroot, WG
    [J]. FLOOD ISSUES IN CONTEMPORARY WATER MANAGEMENT, 2000, 71 : 175 - 184