Harbor Cable Project Submarine Cable in Busy Boston Harbor Installed in just 24 Months

被引:0
|
作者
Said, Jenn
机构
关键词
Submarines;
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
引用
收藏
页码:16 / 18
页数:3
相关论文
共 33 条
  • [1] Financing the boston harbor project
    Levy, Paul F.
    Civil Engineering Practice, 1994, 9 (01):
  • [2] Perspective: the boston harbor project
    MacDonald, Douglas B.
    Civil Engineering Practice, 1994, 9 (01):
  • [3] The Boston Harbor Project, and large decreases in loadings of eutrophication-related materials to Boston Harbor
    Taylor, David I.
    MARINE POLLUTION BULLETIN, 2010, 60 (04) : 609 - 619
  • [4] Pearl Harbor cable links past, future
    不详
    POWER, 2006, 150 (02) : 11 - +
  • [5] Boston Harbor Tunnel Project utilizes CLSM
    Sullivan, Richard W.
    Concrete International, 1997, 19 (05): : 40 - 43
  • [6] VENUS project - Submarine cable recovery system
    Kawaguchi, K
    Momma, H
    Iwase, R
    PROCEEDINGS OF THE 1998 INTERNATIONAL SYMPOSIUM ON UNDERWATER TECHNOLOGY, 1998, : 448 - 452
  • [7] Construction of the Inter-Island Tunnel - Boston Harbor Project
    Ferguson, DW
    Shufflebotham, RL
    Page, TL
    Stewart, AJ
    1997 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1997, : 339 - 358
  • [8] POLARIZATION MODE DISPERSION MEASUREMENTS IN AN INSTALLED OPTICAL FIBER SUBMARINE CABLE
    NAMIHIRA, Y
    HORIUCHI, Y
    MOCHIZUKI, K
    WAKABAYASHI, H
    IEEE PHOTONICS TECHNOLOGY LETTERS, 1989, 1 (10) : 329 - 331
  • [9] Safety monitoring of the cable stayed bridge in the Commercial Harbor of Venice, Italy
    Briseghella, B.
    Siviero, E.
    Lan, C.
    Mazzarolo, E.
    Zordan, T.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 1944 - 1951
  • [10] Utility, MWRA tussling over harbor cable-placement cost
    Maloney, Peter
    ENR (Engineering News-Record), 2015, 274 (49):