Harbor Cable Project Submarine Cable in Busy Boston Harbor Installed in just 24 Months

被引:0
|
作者
Said, Jenn
机构
关键词
Submarines;
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
引用
收藏
页码:16 / 18
页数:3
相关论文
共 33 条
  • [22] Long-Haul WDM/SDM Transmission Over Coupled 4-Core Fibers Installed in Submarine Cable
    Arikawa, Manabu
    Wu, Mingqi
    Yasuhara, Keisuke
    Masuda, Daishi
    Hayashi, Kazunori
    Inoue, Takanori
    Inada, Yoshihisa
    JOURNAL OF LIGHTWAVE TECHNOLOGY, 2023, 41 (06) : 1649 - 1657
  • [23] Field demonstration of 10-Gb/s line-rate transmission on an installed transoceanic submarine lightwave cable
    Park, YK
    Nguyen, TV
    Mizuhara, O
    Chen, CD
    Tzeng, LD
    Yeates, PD
    Heismann, F
    Chen, YC
    Ehrenberg, DG
    Feggeler, JC
    IEEE PHOTONICS TECHNOLOGY LETTERS, 1996, 8 (03) : 425 - 427
  • [24] 125-Gb/s CP-QPSK Field Trial over 4108 km of Installed Submarine Cable
    Veljanovski, Vladimir
    Sleiffer, Vincent
    van den Borne, Dirk
    Capasso, Joe
    Kuluslu, Hayri
    Seixas, Jose
    Schramm, Volker
    Tschersich, Alexander
    Nogueira, Rogerio
    Pavlovic, Natasa
    Ivarson, Kristofer
    Spaelter, Stefan
    de Waardt, Huug
    2011 OPTICAL FIBER COMMUNICATION CONFERENCE AND EXPOSITION (OFC/NFOEC) AND THE NATIONAL FIBER OPTIC ENGINEERS CONFERENCE, 2011,
  • [25] Limited influence of a wind power project submarine cable on a Laurentian Great Lakes fish community
    Dunlop, E. S.
    Reid, S. M.
    Murrant, M.
    JOURNAL OF APPLIED ICHTHYOLOGY, 2016, 32 (01) : 18 - 31
  • [26] Voltage-Drop Calculations and Power Cable Designs for Harbor Electrical Distribution Systems With High Voltage Shore Connection
    Chou, Min-Hung
    Su, Chun-Lien
    Lee, Yung-Chi
    Chin, Hai-Ming
    Parise, Giuseppe
    Chavdarian, Peniamin
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2017, 53 (03) : 1807 - 1814
  • [27] 45.8 and 125 Gb/s CP-QPSK/CP-BPSK Field Trial Over Installed Submarine Cable
    Sleiffer, Vincent A. J. M.
    Veljanovski, Vladimir
    van den Borne, Dirk
    Capasso, Joe
    Kuluslu, Hayri
    Seixas, Jose
    Schramm, Volker
    Tschersich, Alexander
    Nogueira, Rogerio
    Pavlovic, Natasa B.
    Ivarson, Kristofer
    Spaelter, Stefan
    de Waardt, Huug
    JOURNAL OF LIGHTWAVE TECHNOLOGY, 2012, 30 (04) : 624 - 633
  • [28] Longitudinal dispersion evaluation in a 120km long installed submarine cable using a bi-directional OTDR technique
    Nakajima, K
    Ohashi, M
    Tsujikawa, K
    Kato, M
    Tajima, K
    Miyajima, Y
    ELECTRONICS LETTERS, 1998, 34 (04) : 386 - 388
  • [29] Monitoring Cable Force of FAST Project Based on Fiber Bragg Grating Sensor External Installed on Anchorage Zone
    Zhu W.
    Qin H.
    Li J.
    Ou J.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2017, 53 (17): : 23 - 30
  • [30] 3711KM, 4X2.5GBIT/S WDM TRANSMISSION OVER INSTALLED RIOJA SUBMARINE CABLE SYSTEM
    CHAUDHRY, MS
    SIMEONIDOU, D
    JONES, KP
    TAYLOR, NH
    MORKEL, PR
    ELECTRONICS LETTERS, 1995, 31 (18) : 1588 - 1589