Integrating production and transportation scheduling in a two-stage supply chain

被引:10
|
作者
Liao, Ching-Jong [1 ]
Kuo, Yu-Wei [1 ]
Chung, Tsui-Ping [2 ]
Shih, Stephen C. [3 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
[2] Jilin Univ, Coll Mech Sci & Engn, Changchun 130025, Peoples R China
[3] So Illinois Univ, Sch Informat Syst & Appl Technol, Carbondale, IL 62901 USA
关键词
electromagnetism-like mechanism; scheduling; two-stage supply chain; transportation; DELIVERY CONSIDERATIONS; ALGORITHM; MINIMIZE;
D O I
10.1504/EJIE.2015.069344
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper is concerned with the research on coordinated scheduling of production and transportation in a two-stage supply chain. The first stage involves scheduling multiple suppliers with various production speeds while the second stage deals with the scheduling job of several vehicles under the assumption that each vehicle is travelling at a different speed and has different transport capacity. The primary objective of this research is to minimise the maximum completion time for all jobs. With that, a new heuristic is proposed and an electromagnetism-like mechanism (EM) algorithm is developed for searching a near optimal or optimal solution. Computational results show that the proposed EM algorithm embedded with the heuristic significantly is better than an existing gendered genetic algorithm, with an average improvement of 20.66% while using much less computation time.
引用
收藏
页码:327 / 343
页数:17
相关论文
共 50 条
  • [41] Analysis of supply chain coordination under fuzzy demand in a two-stage supply chain
    Xu, Ruoning
    Zhai, Xiaoyan
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (01) : 129 - 139
  • [42] Scheduling two-stage production lines with multiple machines
    Qi, M
    PRODUCTION PLANNING & CONTROL, 1996, 7 (04) : 418 - 429
  • [43] Outsourcing and production scheduling for a two-stage flow shop
    Qi, Xiangtong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 129 (01) : 43 - 50
  • [44] A Two-stage Heuristic Method for Vulcanization Production Scheduling
    Yu, Shengping
    Yang, Diancai
    Wang, Xiuying
    Zhu, Kehui
    Zheng, Binglin
    2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3601 - 3605
  • [46] Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain
    Pei, Jun
    Liu, Xinbao
    Pardalos, Panos M.
    Fan, Wenjuan
    Yang, Shanlin
    Wang, Ling
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (1-4): : 335 - 348
  • [47] Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain
    Jun Pei
    Xinbao Liu
    Panos M. Pardalos
    Wenjuan Fan
    Shanlin Yang
    Ling Wang
    The International Journal of Advanced Manufacturing Technology, 2014, 70 : 335 - 348
  • [48] Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
    Li, Kunpeng
    Ganesan, Viswanath Kumar
    Sivakumar, Appa Iyer
    COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 51 (02) : 264 - 278
  • [49] Designing a Medical Supply Chain Network Considering the Risk of Supply and Flexible Production in Two-Stage Uncertain Conditions
    Hazrati, Reza
    Samaei, Mohamad
    Hejri, Farkhondeh Mortaz
    Haddad, Shervin
    Amiriyan, Sajad
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [50] Integrated pricing and supplier selection in a two-stage supply chain
    Adeinat, Hamza
    Ventura, Jose A.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 201 : 193 - 202