Integrating production and transportation scheduling in a two-stage supply chain

被引:10
|
作者
Liao, Ching-Jong [1 ]
Kuo, Yu-Wei [1 ]
Chung, Tsui-Ping [2 ]
Shih, Stephen C. [3 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
[2] Jilin Univ, Coll Mech Sci & Engn, Changchun 130025, Peoples R China
[3] So Illinois Univ, Sch Informat Syst & Appl Technol, Carbondale, IL 62901 USA
关键词
electromagnetism-like mechanism; scheduling; two-stage supply chain; transportation; DELIVERY CONSIDERATIONS; ALGORITHM; MINIMIZE;
D O I
10.1504/EJIE.2015.069344
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper is concerned with the research on coordinated scheduling of production and transportation in a two-stage supply chain. The first stage involves scheduling multiple suppliers with various production speeds while the second stage deals with the scheduling job of several vehicles under the assumption that each vehicle is travelling at a different speed and has different transport capacity. The primary objective of this research is to minimise the maximum completion time for all jobs. With that, a new heuristic is proposed and an electromagnetism-like mechanism (EM) algorithm is developed for searching a near optimal or optimal solution. Computational results show that the proposed EM algorithm embedded with the heuristic significantly is better than an existing gendered genetic algorithm, with an average improvement of 20.66% while using much less computation time.
引用
收藏
页码:327 / 343
页数:17
相关论文
共 50 条
  • [21] The value of information sharing in a two-stage supply chain with production capacity constraints
    Simchi-Levi, D
    Zhao, Y
    NAVAL RESEARCH LOGISTICS, 2003, 50 (08) : 888 - 916
  • [22] Outsourcing Strategies in a Two-Stage Supply Chain Model with Insufficient Production Capacity
    Das, Debabrata
    Hui, Nirmal Baran
    ADVANCES IN MATERIALS AND MANUFACTURING ENGINEERING, ICAMME 2019, 2020, : 223 - 229
  • [23] TWO-STAGE SUPPLY CHAIN INVENTORY SYSTEM CONSIDERING PRODUCTION POSTPONEMENT AND REWORK
    Huang, Yen-Deng
    Chung, Rih-Lung
    Cheng, Yung-Lung
    Wee, Hui-Ming
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2017, 24 (05): : 449 - 467
  • [24] Coordination mechanisms in a two-stage green supply chain: analyzing the impact of transportation decisions on environment
    Ramandi, Milad Darzi
    Bafruei, Morteza Khakzar
    Ansaripoor, Amir H.
    Paul, Sanjoy Kumar
    Chowdhury, Md Maruf Hossan
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2023, 30 (06) : 4170 - 4207
  • [25] Two-stage production scheduling with an outsourcing option
    Lee, Kangbok
    Choi, Byung-Cheon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (03) : 489 - 497
  • [26] Scheduling production tasks in a two-stage FMS
    Blazewicz, J
    Pawlak, G
    Walter, B
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (17) : 4341 - 4352
  • [27] Integration scheduling optimization problem of production and transportation in supply chain
    Pei, Jun
    Liu, Xin-Bao
    Fan, Wen-Juan
    Liu, Lin
    Zhang, Yu-Lei
    Nanjing Li Gong Daxue Xuebao/Journal of Nanjing University of Science and Technology, 2012, 36 (SUPPL.2): : 292 - 298
  • [28] A two-stage flow shop scheduling problem with transportation considerations
    Nacira Chikhi
    Moncef Abbas
    Rachid Benmansour
    Abdelghani Bekrar
    Saïd Hanafi
    4OR, 2015, 13 : 381 - 402
  • [29] A two-stage flow shop scheduling problem with transportation considerations
    Chikhi, Nacira
    Abbas, Moncef
    Benmansour, Rachid
    Bekrar, Abdelghani
    Hanafi, Said
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402
  • [30] Two-stage medical supply chain scheduling with an assignable common due window and shelf life
    Zhang, Long
    Zhang, Yuzhong
    Bai, Qingguo
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2019, 37 (01) : 319 - 329