A new scheduling technique for the resource-constrained project scheduling problem with discounted cash flows

被引:38
|
作者
Leyman, Pieter [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Operat & Technol Management Ctr, Ghent, Belgium
[3] UCL, Dept Management Sci & Innovat, London, England
关键词
genetic algorithm; resource-constrained project scheduling; net present value; NET PRESENT VALUE; GENETIC ALGORITHM; BOUND PROCEDURE; MODELS; CLASSIFICATION; SUBJECT; SEARCH;
D O I
10.1080/00207543.2014.980463
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we discuss the resource-constrained project scheduling problem with discounted cash flows. We introduce a new schedule construction technique which moves sets of activities to improve the project net present value and consists of two steps. In particular, the inclusion of individual activities into sets, which are then moved together, is crucial in both steps. The first step groups the activities based on the predecessors and successors in the project network, and adds these activities to a set based on their finish time and cash flow. The second step on the contrary does so based on the neighbouring activities in the schedule, which may but need not include precedence related activities. The proposed scheduling method is implemented in a genetic algorithm metaheuristic and we employ a penalty function to improve the algorithm's feasibility with respect to a tight deadline. All steps of the proposed solution methodology are tested in detail and an extensive computational experiment shows that our results are competitive with existing work.
引用
收藏
页码:2771 / 2786
页数:16
相关论文
共 50 条
  • [31] Ant colony algorithm for scheduling resource constrained projects with discounted cash flows
    Shou, Yong-Yi
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 176 - +
  • [32] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [33] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [34] Integration of routing into a resource-constrained project scheduling problem
    Lacomme, Philippe
    Moukrim, Aziz
    Quilliot, Alain
    Vinot, Marina
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2019, 7 (04) : 421 - 464
  • [35] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    Journal of Scheduling, 2019, 22 : 211 - 237
  • [36] Periodically aggregated resource-constrained project scheduling problem
    Morin, Pierre-Antoine
    Artigues, Christian
    Hait, Alain
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 792 - 817
  • [37] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [38] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [39] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287
  • [40] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721