Design-related questions in the construction phase: the effect of using the Last Planner System in design management

被引:6
|
作者
Maki, Tarja [1 ,2 ]
Kerosuo, Hannele [1 ,2 ]
机构
[1] Univ Helsinki, Fac Educ Sci, Dept Educ, CRADLE, Siltavuorenpenger 1-5, Helsinki, Finland
[2] Univ Helsinki, Ctr Res Act Dev & Learning, FIN-00014 Helsinki, Finland
基金
芬兰科学院;
关键词
construction management; Last Planner System; building information modelling (BIM); site meeting; discussion; TEAM MEETINGS; COMMUNICATION; COLLABORATION; EXPERTISE;
D O I
10.1139/cjce-2018-0382
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study explores designers, engineers, and managers sharing their knowledge and resolving design-related issues during construction site meetings. It provides new insights into the collaboration and the expertise of the different partners. In addition, the study provides new knowledge of using LPS in the design phase and its influence on the site meeting discussions in the construction phase. The research data comprise video recordings of 17 site meetings in two BIM-based renovation projects. Based on the data, the construction managers were the most active in addressing issues; however, all partners were actively involved in the discussion and shared their expertise to address the open questions. The use of the Last Planner System in the design phase seemed to decrease the number of design-related open questions in the construction phase. The findings emphasize the need to develop more collaborative design management methods and practices for sharing each expertise.
引用
收藏
页码:132 / 139
页数:8
相关论文
共 50 条
  • [41] Research on the construction of Industrial Design knowledge agile management system
    Li Bo
    Ji Xiaomin
    PROCEEDINGS 2015 SIXTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND ENGINEERING APPLICATIONS ISDEA 2015, 2015, : 672 - 675
  • [42] Design and Implementation of Intelligent Construction Engineering Information Management System
    Jiang, Honglie
    2019 11TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2019), 2019, : 23 - 27
  • [43] Design and Application of Whole Process Management System for Construction Cost
    Zhang, Yan
    Tan, Janmin
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (03): : 2365 - 2368
  • [44] The Analyzing and Design of China Construction Market Management Information System
    Luo, Jian
    Zhu, Wenzhou
    Cheng, Qinghui
    SECOND INTERNATIONAL CONFERENCE ON COMPUTER AND ELECTRICAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 413 - +
  • [45] The Design and Realization of Construction-Land Management information System
    Chen, Junjie
    Ren, Xiaofang
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 92 - 94
  • [46] Architecture Design for Location Information Management System on Construction Site
    Park, Jae-Sun
    Kim, Jang-Ryul
    Kim, Jong-Hwa
    Sun, Woo-young
    Pyeon, Mu-Wook
    INFORMATION AND ELECTRONICS ENGINEERING, 2011, 6 : 204 - 208
  • [47] The Research on Management Information System Design for Construction Engineering Quality
    Wu Yuling
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2015), 2015, 27 : 1257 - 1260
  • [48] The Construction Safety Information Management System Design for Building Enterprise
    Jia, Chunhui
    Zhang, Shoujian
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 316 - 319
  • [49] Early phase design process of an intelligent coaching system for behaviour change related to stress management
    Jingar, Monika
    BEHAVIOUR & INFORMATION TECHNOLOGY, 2023,
  • [50] Risk management in the design phase of large-scale construction projects
    El-Dash, Karim
    Abd-Raboh, Emad
    El-Dars, Zakariya
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 263 - 269