Design-related questions in the construction phase: the effect of using the Last Planner System in design management

被引:6
|
作者
Maki, Tarja [1 ,2 ]
Kerosuo, Hannele [1 ,2 ]
机构
[1] Univ Helsinki, Fac Educ Sci, Dept Educ, CRADLE, Siltavuorenpenger 1-5, Helsinki, Finland
[2] Univ Helsinki, Ctr Res Act Dev & Learning, FIN-00014 Helsinki, Finland
基金
芬兰科学院;
关键词
construction management; Last Planner System; building information modelling (BIM); site meeting; discussion; TEAM MEETINGS; COMMUNICATION; COLLABORATION; EXPERTISE;
D O I
10.1139/cjce-2018-0382
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study explores designers, engineers, and managers sharing their knowledge and resolving design-related issues during construction site meetings. It provides new insights into the collaboration and the expertise of the different partners. In addition, the study provides new knowledge of using LPS in the design phase and its influence on the site meeting discussions in the construction phase. The research data comprise video recordings of 17 site meetings in two BIM-based renovation projects. Based on the data, the construction managers were the most active in addressing issues; however, all partners were actively involved in the discussion and shared their expertise to address the open questions. The use of the Last Planner System in the design phase seemed to decrease the number of design-related open questions in the construction phase. The findings emphasize the need to develop more collaborative design management methods and practices for sharing each expertise.
引用
收藏
页码:132 / 139
页数:8
相关论文
共 50 条
  • [21] Quality Management in the Design and Construction Phase: A Case Study
    Memon, Nafees Ahmed
    Abro, Qazi Muhammad Moinuddin
    Mugheri, Farida
    MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2011, 30 (03) : 511 - 520
  • [22] Using safety system during the design phase to minimize waste in construction projects
    Mahfuth K.
    Loulizi A.
    Tayeh B.A.
    Al Hallaq K.
    Aisheh Y.I.A.
    Journal of King Saud University - Engineering Sciences, 2022, 34 (03) : 170 - 179
  • [23] Using Design Questions to Analyze System Adaptation Potential
    Marshall, Allen
    Riley, Ian
    Quirk, Logan
    Gamble, Rose
    2022 IEEE INTERNATIONAL CONFERENCE ON AUTONOMIC COMPUTING AND SELF-ORGANIZING SYSTEMS COMPANION (ACSOS-C 2022), 2022, : 113 - 118
  • [24] Design and Implementation of Construction Engineering Business Management System
    Chen Haojie
    2017 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA), 2017, : 664 - 667
  • [25] Construction Materials Management System Design Based on Barcode
    Guo, Jing
    ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 2825 - 2829
  • [26] DESIGN INTERFACE MANAGEMENT SYSTEM (DIMS) FOR CONSTRUCTION PROJECTS
    Senthilkumar, V.
    Varghese, Koshy
    PROCEEDINGS OF THE 10TH INTERNATIONAL DSM CONFERENCE, 2008, : 169 - 182
  • [27] Design and Application of Subway Construction Site Management System
    Zhu, Pin
    Chen, Xinyi
    Wan, Fucheng
    Gao, Tengfei
    PROCEEDINGS OF THE 2017 GLOBAL CONFERENCE ON MECHANICS AND CIVIL ENGINEERING (GCMCE 2017), 2017, 132 : 73 - 76
  • [28] A prototype of workflow management system for construction design projects
    杨明宇
    Journal of Chongqing University, 2005, (03) : 144 - 148
  • [29] Design and development of construction safety management information system
    Zhang Shoujian
    Liu Li
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 510 - 513
  • [30] The Design of Management Information System for Construction Project Cost
    Wu Caixuan
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2015), 2015, 27 : 1261 - 1264