ICCSIP: An inexact chance-constrained semi-infinite programming approach for energy systems planning under uncertainty

被引:39
|
作者
Guo, P. [1 ]
Huang, G. H. [2 ]
He, L. [1 ]
Cai, Y. P. [1 ,3 ]
机构
[1] Univ Regina, Fac Engn, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
[2] Univ Waterloo, Dept Civil & Environm Engn, Waterloo, ON N2L 3G1, Canada
[3] Beijing Normal Univ, Chinese Res Acad Environm Sci, Beijing 100875, Peoples R China
基金
加拿大自然科学与工程研究理事会;
关键词
chance-constrained programming; energy management system; functional interval; semi-infinite programming; uncertainty;
D O I
10.1080/15567030801928961
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This article developed an inexact chance-constrained semi-infinite programming (ICCSIP) method for the energy management system under functional interval uncertainties. The approach not only considers the left-hand interval parameters, right-hand distribution information, and the probability of violating constraint, but also deals with functional interval uncertainty, which extends the range of the uncertainties. A regional energy management system is applied to illustrate the applicability of the ICCSIP approach. In consideration of energy sources allocation, fuel prices, and environmental regulations, a systematic planning of the regional energy structure is desired to bring a significant increase of economic benefit and improvement of environmental quality. This problem can be formulated as a programming model with an objective of minimizing the overall system costs subject to a number of environmental, economic and energy sources availability constraints. The programming results indicate that reasonable and useful decision alternatives can be generated under different probabilities of violating the system constraints. The obtained results are useful for decision makers to gain an insight into the tradeoffs among environmental, economic and system reliability criteria.
引用
收藏
页码:1345 / 1366
页数:22
相关论文
共 50 条
  • [41] Constrained incremental bundle method with partial inexact oracle for nonsmooth convex semi-infinite programming problems
    Pang, Li-Ping
    Lv, Jian
    Wang, Jin-He
    COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2016, 64 (02) : 433 - 465
  • [42] Dynamic Traffic Assignment under Uncertainty: A Distributional Robust Chance-Constrained Approach
    Byung Do Chung
    Tao Yao
    Bo Zhang
    Networks and Spatial Economics, 2012, 12 : 167 - 181
  • [43] PRODUCTIVE EFFICIENCY UNDER CAPITALISM AND STATE SOCIALISM - THE CHANCE-CONSTRAINED PROGRAMMING APPROACH
    LAND, KC
    LOVELL, CAK
    THORE, S
    PUBLIC FINANCE-FINANCES PUBLIQUES, 1992, 47 : 109 - 121
  • [44] A generalized fuzzy chance-constrained energy systems planning model for Guangzhou, China
    Cai, Mengting
    Huang, Guohe
    Chen, Jiapei
    Li, Yunhuan
    Fan, Yurui
    ENERGY, 2018, 165 : 191 - 204
  • [45] Chance-constrained programming with robustness for lot-sizing and scheduling problems under complex uncertainty
    Hui, Jizhuang
    Wang, Shuai
    Bin, Zhu
    Xiong, Guangwei
    Lv, Jingxiang
    ASSEMBLY AUTOMATION, 2022, 42 (04) : 490 - 505
  • [46] A data-driven mixed integer programming approach for joint chance-constrained optimal power flow under uncertainty
    Qin, James Ciyu
    Jiang, Rujun
    Mo, Huadong
    Dong, Daoyi
    INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2025, 16 (02) : 1111 - 1127
  • [47] Fuzzy Chance-Constrained Integer Programming Models for Portfolio Investment Selection and Optimization Under Uncertainty
    Srizongkhram, Shayarath
    Manitayakul, Kittitath
    Suthamanondh, Pisacha
    Chiadamrong, Navee
    INTERNATIONAL JOURNAL OF KNOWLEDGE AND SYSTEMS SCIENCE, 2020, 11 (03) : 33 - 58
  • [48] A Chance-Constrained Interval-Inexact Energy Systems Planning Model (CCIESM) for City B based on Power Demand Probabilistic Forecasting
    Wang, Zongwu
    Huang, Guohe
    Niu, Yantao
    MATERIALS PROCESSING AND MANUFACTURING III, PTS 1-4, 2013, 753-755 : 1891 - 1902
  • [49] Chance-Constrained Generic Energy Storage Operations Under Decision-Dependent Uncertainty
    Qi, Ning
    Pinson, Pierre
    Almassalkhi, Mads R.
    Cheng, Lin
    Zhuang, Yingrui
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2023, 14 (04) : 2234 - 2248
  • [50] A CHANCE-CONSTRAINED OPTIMIZATION APPROACH FOR AIR TRAFFIC FLOW MANAGEMENT UNDER CAPACITY UNCERTAINTY
    Abdelghani, Fadil
    Cai, Kaiquan
    Zhang, Minghua
    2022 INTEGRATED COMMUNICATION, NAVIGATION AND SURVEILLANCE CONFERENCE (ICNS), 2022,