Assessment of the Blasting Efficiency of a Long and Large-Diameter Uncharged Hole Boring Method in Tunnel Blasting Using 3D Numerical Analysis

被引:10
|
作者
Kim, Min-Seong [1 ]
Kim, Chang-Yong [1 ]
Song, Myung-Kyu [2 ]
Lee, Sean Seungwon [2 ]
机构
[1] Korea Inst Civil Engn & Bldg Technol, Dept Geotech Engn Res, 283 Goyang Daero, Goyang Si 10223, South Korea
[2] Hanyang Univ, Dept Earth Resources & Environm Engn, 222 Wangsimni Ro, Seoul 04763, South Korea
关键词
tunnel excavation; cut blasting method; LLB method; uncharged hole; numerical simulation; INDUCED VIBRATION; WAVE-PROPAGATION; GROUND VIBRATION; CONSTRUCTION; SIMULATION; CARBIDE; MASS;
D O I
10.3390/su142013347
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Cut blasting is one of the most essential processes to reduce blast-induced vibration in tunnel blasting. The long and large-diameter uncharged hole boring (LLB) method is an example of one of the cut blasting methods, which utilizes large-diameter uncharged holes drilled in the tunnel face. In this study, blasting simulations were performed to analyze its blasting mechanism, and the LLB method and the traditional burn-cut method were simulated to compare their blasting efficiency. A 3D numerical analysis using LS-DYNA code, a highly non-linear transient dynamic finite element analysis using explicit time integration, was used to simulate the blasting process, and a Johnson-Holmquist constitutive material model, which is optimal for simulating brittle materials under dynamic conditions, was used to simulate the rock behavior under blasting. The modified LLB method showed a 3.75-fold increase in the advance per round compared to the burn-cut method, due to the increased formation of long and large-diameter uncharged holes compared to blast holes. This modified LLB method used 30% less explosives, so its failure range was approximately 1.25 times less than that of the burn-cut method, but its advance was approximately 4 times larger than the burn-cut method, which was similar to the original LLB method. This confirmed that the modified LLB method is significantly more efficient in terms of increased blasting efficiency (particularly the advance per round) as well as reduced blast-induced vibration, compared to the traditional cut blasting method.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Numerical Study Investigating the Blasting Efficiency of the Long and Large-Diameter Uncharged Hole-Boring Method with Deck Charge Technique
    Kim, Min-Seong
    Yoo, Wan-Kyu
    Kim, Wooseok
    Hwang, Sungpil
    Kim, Chang-Yong
    Lee, Sean Seungwon
    APPLIED SCIENCES-BASEL, 2023, 13 (04):
  • [2] Successful long drift rounds by blasting to a large diameter uncharged hole
    Fjellborg, S
    Olsson, M
    ROCK FRAGMENTATION BY BLASTING, 1996, : 397 - 405
  • [3] Optimization of the matching relationship between the stemming length and minimum burden in cut blasting of large-diameter long-hole stopes
    Zongguo Zhang
    Xianyang Qiu
    Xiuzhi Shi
    Jian Zhou
    Zhihua Luo
    Jian Ouyang
    Haoqiang Zhang
    Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2023, 9
  • [4] Burden Effects on Rock Fragmentation and Damage, and Stress Wave Attenuation in Cut Blasting of Large-Diameter Long-Hole Stopes
    Zhang, Zongguo
    Qiu, Xianyang
    Shi, Xiuzhi
    Luo, Zhihua
    Chen, Hui
    Zong, Chengxing
    ROCK MECHANICS AND ROCK ENGINEERING, 2023, 56 (12) : 8657 - 8675
  • [5] Burden Effects on Rock Fragmentation and Damage, and Stress Wave Attenuation in Cut Blasting of Large-Diameter Long-Hole Stopes
    Zongguo Zhang
    Xianyang Qiu
    Xiuzhi Shi
    Zhihua Luo
    Hui Chen
    Chengxing Zong
    Rock Mechanics and Rock Engineering, 2023, 56 : 8657 - 8675
  • [6] Optimization of the matching relationship between the stemming length and minimum burden in cut blasting of large-diameter long-hole stopes
    Zhang, Zongguo
    Qiu, Xianyang
    Shi, Xiuzhi
    Zhou, Jian
    Luo, Zhihua
    Ouyang, Jian
    Zhang, Haoqiang
    GEOMECHANICS AND GEOPHYSICS FOR GEO-ENERGY AND GEO-RESOURCES, 2023, 9 (01)
  • [7] A Preliminary Study on the Design Method for Large-Diameter Deep-Hole Presplit Blasting and Its Vibration-Isolation Effect
    Xiao, Shuangshuang
    Wang, Hongsheng
    Dong, Guowei
    SHOCK AND VIBRATION, 2019, 2019
  • [8] Blasting practice of ore pillar recovery with high block and large diameter long-hole stoping method
    Kuangye Yanjiu Yu Kaifa/Mining Research and Development, 1997, 17 (04): : 55 - 57
  • [9] Cut Blasting Optimization Using 3D Laser Scanning and Numerical SimulationCut Blasting Optimization Using 3D Laser Scanning and Numerical SimulationX. Zhang et al.
    Xiang Zhang
    Shuai You
    Yang Yang
    Jin Li
    Zhen Yang
    Shulin Chen
    Xiaojie Li
    Rock Mechanics and Rock Engineering, 2025, 58 (2) : 2549 - 2568
  • [10] Comprehensive Review of Tunnel Blasting Evaluation Techniques and Innovative Half Porosity Assessment Using 3D Image Reconstruction
    Shi, Jianjun
    Wang, Yang
    Yang, Zhengyu
    Shan, Wenxin
    An, Huaming
    Applied Sciences (Switzerland), 2024, 14 (21):