共 50 条
- [1] Numerical Study Investigating the Blasting Efficiency of the Long and Large-Diameter Uncharged Hole-Boring Method with Deck Charge Technique APPLIED SCIENCES-BASEL, 2023, 13 (04):
- [2] Successful long drift rounds by blasting to a large diameter uncharged hole ROCK FRAGMENTATION BY BLASTING, 1996, : 397 - 405
- [3] Optimization of the matching relationship between the stemming length and minimum burden in cut blasting of large-diameter long-hole stopes Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2023, 9
- [5] Burden Effects on Rock Fragmentation and Damage, and Stress Wave Attenuation in Cut Blasting of Large-Diameter Long-Hole Stopes Rock Mechanics and Rock Engineering, 2023, 56 : 8657 - 8675
- [8] Blasting practice of ore pillar recovery with high block and large diameter long-hole stoping method Kuangye Yanjiu Yu Kaifa/Mining Research and Development, 1997, 17 (04): : 55 - 57
- [10] Comprehensive Review of Tunnel Blasting Evaluation Techniques and Innovative Half Porosity Assessment Using 3D Image Reconstruction Applied Sciences (Switzerland), 2024, 14 (21):