Assessment of the Blasting Efficiency of a Long and Large-Diameter Uncharged Hole Boring Method in Tunnel Blasting Using 3D Numerical Analysis

被引:10
|
作者
Kim, Min-Seong [1 ]
Kim, Chang-Yong [1 ]
Song, Myung-Kyu [2 ]
Lee, Sean Seungwon [2 ]
机构
[1] Korea Inst Civil Engn & Bldg Technol, Dept Geotech Engn Res, 283 Goyang Daero, Goyang Si 10223, South Korea
[2] Hanyang Univ, Dept Earth Resources & Environm Engn, 222 Wangsimni Ro, Seoul 04763, South Korea
关键词
tunnel excavation; cut blasting method; LLB method; uncharged hole; numerical simulation; INDUCED VIBRATION; WAVE-PROPAGATION; GROUND VIBRATION; CONSTRUCTION; SIMULATION; CARBIDE; MASS;
D O I
10.3390/su142013347
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Cut blasting is one of the most essential processes to reduce blast-induced vibration in tunnel blasting. The long and large-diameter uncharged hole boring (LLB) method is an example of one of the cut blasting methods, which utilizes large-diameter uncharged holes drilled in the tunnel face. In this study, blasting simulations were performed to analyze its blasting mechanism, and the LLB method and the traditional burn-cut method were simulated to compare their blasting efficiency. A 3D numerical analysis using LS-DYNA code, a highly non-linear transient dynamic finite element analysis using explicit time integration, was used to simulate the blasting process, and a Johnson-Holmquist constitutive material model, which is optimal for simulating brittle materials under dynamic conditions, was used to simulate the rock behavior under blasting. The modified LLB method showed a 3.75-fold increase in the advance per round compared to the burn-cut method, due to the increased formation of long and large-diameter uncharged holes compared to blast holes. This modified LLB method used 30% less explosives, so its failure range was approximately 1.25 times less than that of the burn-cut method, but its advance was approximately 4 times larger than the burn-cut method, which was similar to the original LLB method. This confirmed that the modified LLB method is significantly more efficient in terms of increased blasting efficiency (particularly the advance per round) as well as reduced blast-induced vibration, compared to the traditional cut blasting method.
引用
收藏
页数:15
相关论文
共 50 条
  • [11] Side Friction of Large-Diameter Steel Cylinder Simulated Using 3D Discrete Element Method
    Ding X.
    Shi Y.
    Chen J.
    Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 2020, 48 (04): : 15 - 27
  • [12] Blasting Fragmentation Study Using 3D Image Analysis of a Hard Rock Mine
    Figueiredo, Janine
    Torres, Vidal
    Cruz, Rodolfo
    Moreira, Douglas
    APPLIED SCIENCES-BASEL, 2023, 13 (12):
  • [13] 3D dynamic analysis of JCO manufacturing process of large-diameter submarine pipelines
    Xie, Peng
    Chang, Jiang-Tao
    Chuan Bo Li Xue/Journal of Ship Mechanics, 2022, 26 (02): : 235 - 249
  • [14] 3D finite element analysis of a large-diameter pipe jacking during construction stage
    Zhenyu, Gao
    Haihong, Mo
    Chunshan, Yang
    Jinhua, Li
    Zhenyu, G. (13631372837@126.com), 1600, E-Journal of Geotechnical Engineering (19 D): : 781 - 789
  • [15] Using 3D Numerical Analysis for the Assessment of Tunnel–Landslide Relationship: Bahce–Nurdag Tunnel (South of Turkey)
    M. P. Komu
    U. Guney
    T. E. Kilickaya
    C. Gokceoglu
    Geotechnical and Geological Engineering, 2020, 38 : 1237 - 1254
  • [16] Development of a 3D numerical model for simulating a blast wave propagation system considering me position of the blasting hole and in-situ discontinuities
    Yari, Mojtaba
    Ghadyani, Daniyal
    Jamali, Saeed
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2022, 37 (02): : 67 - 78
  • [17] Probabilistic safety risk assessment in large-diameter tunnel construction using an interactive and explainable tree-based pipeline optimization method
    Lin, Penghui
    Wu, Maozhi
    Zhang, Limao
    APPLIED SOFT COMPUTING, 2023, 143
  • [18] Using 3D Numerical Analysis for the Assessment of Tunnel-Landslide Relationship: Bahce-Nurdag Tunnel (South of Turkey)
    Komu, M. P.
    Guney, U.
    Kilickaya, T. E.
    Gokceoglu, C.
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (02) : 1237 - 1254
  • [19] Numerical analysis of deep hole multi-stage cut blasting of vertical shaft using a continuum-based discrete element method
    Ding C.
    Yang R.
    Zheng C.
    Yang L.
    He S.
    Feng C.
    Arabian Journal of Geosciences, 2021, 14 (12)
  • [20] An analysis of interaction between large diameter double tube tunnels excavated in weak soils through 3D numerical analysis; An example of Bolu Tunnel
    Aygar, Ebu Bekir
    Scientific Mining Journal, 2022, 61 (03): : 157 - 168