Numerical Study Investigating the Blasting Efficiency of the Long and Large-Diameter Uncharged Hole-Boring Method with Deck Charge Technique

被引:1
|
作者
Kim, Min-Seong [1 ]
Yoo, Wan-Kyu [1 ]
Kim, Wooseok [1 ]
Hwang, Sungpil [1 ]
Kim, Chang-Yong [1 ]
Lee, Sean Seungwon [2 ]
机构
[1] Korea Inst Civil Engn & Bldg Technol, Dept Geotech Engn Res, 283 Goyang Daero, Goyang 10223, South Korea
[2] Hanyang Univ, Dept Earth Resources & Environm Engn, 222 Wangsimni Ro, Seoul 04763, South Korea
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 04期
关键词
cut method; LLB method; deck charge blasting method; 3D numerical simulation; DESIGN; SIMULATION;
D O I
10.3390/app13042099
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The long and large-diameter uncharged hole-boring (LLB) method is a cut-blasting method used to reduce vibration induced by blasting. This method typically involves creating an uncharged hole with a 382 mm diameter and drilling 50 m in the tunnel excavation direction at a time. This method is reported to provide relatively good vibration reduction and with high blasting efficiency through short hole blasting compared to traditional cut methods. In this study, an advanced LLB method incorporating deck charge blasting was investigated to improve the blasting efficiency during long hole blasting. Numerical analysis was performed via ANSYS LS-DYNA to investigate the effectiveness of the deck charge technique. In the original LLB method, explosives were used to break the rocks more finely, and the fragmented rocks were concen trated at the end of the blast holes. On the contrary, the modified LLB, in which two-part explosives were loaded into the blast holes, is expected to push the fragmented rocks to the tunnel face more effectively than the original LLB method. Therefore, it is expected that the proposed LLB method combined with a deck charge technique can achieve superior blasting efficiency.
引用
收藏
页数:13
相关论文
共 14 条
  • [1] Assessment of the Blasting Efficiency of a Long and Large-Diameter Uncharged Hole Boring Method in Tunnel Blasting Using 3D Numerical Analysis
    Kim, Min-Seong
    Kim, Chang-Yong
    Song, Myung-Kyu
    Lee, Sean Seungwon
    SUSTAINABILITY, 2022, 14 (20)
  • [2] Successful long drift rounds by blasting to a large diameter uncharged hole
    Fjellborg, S
    Olsson, M
    ROCK FRAGMENTATION BY BLASTING, 1996, : 397 - 405
  • [3] A Preliminary Study on the Design Method for Large-Diameter Deep-Hole Presplit Blasting and Its Vibration-Isolation Effect
    Xiao, Shuangshuang
    Wang, Hongsheng
    Dong, Guowei
    SHOCK AND VIBRATION, 2019, 2019
  • [4] Field Monitoring and Numerical Study on the Effects of Reclamation on Large-Diameter Long Pile
    Zhang, X.
    Chen, S.
    Wong, K. S.
    Lu, Z.
    Chen, R.
    Lu, H.
    SOIL MECHANICS AND FOUNDATION ENGINEERING, 2022, 59 (02) : 167 - 175
  • [5] Field Monitoring and Numerical Study on the Effects of Reclamation on Large-Diameter Long Pile
    X. Zhang
    S. Chen
    K. S. Wong
    Z. Lu
    R. Chen
    H. Lu
    Soil Mechanics and Foundation Engineering, 2022, 59 : 167 - 175
  • [6] Optimization of the matching relationship between the stemming length and minimum burden in cut blasting of large-diameter long-hole stopes
    Zongguo Zhang
    Xianyang Qiu
    Xiuzhi Shi
    Jian Zhou
    Zhihua Luo
    Jian Ouyang
    Haoqiang Zhang
    Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2023, 9
  • [7] Burden Effects on Rock Fragmentation and Damage, and Stress Wave Attenuation in Cut Blasting of Large-Diameter Long-Hole Stopes
    Zhang, Zongguo
    Qiu, Xianyang
    Shi, Xiuzhi
    Luo, Zhihua
    Chen, Hui
    Zong, Chengxing
    ROCK MECHANICS AND ROCK ENGINEERING, 2023, 56 (12) : 8657 - 8675
  • [8] Burden Effects on Rock Fragmentation and Damage, and Stress Wave Attenuation in Cut Blasting of Large-Diameter Long-Hole Stopes
    Zongguo Zhang
    Xianyang Qiu
    Xiuzhi Shi
    Zhihua Luo
    Hui Chen
    Chengxing Zong
    Rock Mechanics and Rock Engineering, 2023, 56 : 8657 - 8675
  • [9] Optimization of the matching relationship between the stemming length and minimum burden in cut blasting of large-diameter long-hole stopes
    Zhang, Zongguo
    Qiu, Xianyang
    Shi, Xiuzhi
    Zhou, Jian
    Luo, Zhihua
    Ouyang, Jian
    Zhang, Haoqiang
    GEOMECHANICS AND GEOPHYSICS FOR GEO-ENERGY AND GEO-RESOURCES, 2023, 9 (01)
  • [10] Blasting practice of ore pillar recovery with high block and large diameter long-hole stoping method
    Kuangye Yanjiu Yu Kaifa/Mining Research and Development, 1997, 17 (04): : 55 - 57