Developing tools for the safety specification in risk management plans: lessons learned from a pilot project

被引:2
|
作者
Cooper, Andrew J. P. [1 ]
Lettis, Sally [1 ]
Chapman, Charlotte L. [1 ]
Evans, Stephen J. W. [2 ]
Waller, Patrick C. [3 ]
Shakir, Saad [3 ]
Payvandi, Nassrin [1 ]
Murray, Alison B. [1 ]
机构
[1] GlaxoSmithKline Ltd, Greenford UB6 0HE, Middx, England
[2] London Sch Hyg & Trop Med, Med Stat Unit, London WC1, England
[3] Drug Safety Res Unit, Southampton, Hants, England
关键词
ICH E2E; risk management plan; safety specification; pharmacovigilance plan; adverse event; epidemiology; laboratory data;
D O I
10.1002/pds.1576
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
Purpose Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Methods Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. Results The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. Conclusions This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data. Copyright (C) 2008 John Wiley & Sons, Ltd.
引用
收藏
页码:445 / 454
页数:10
相关论文
共 50 条
  • [41] Lessons learned in disaster risk management from citizen participation
    Canese de Estigarribia, Marta Isabel
    Granada, Violeta Prieto
    Britez, Alberto
    Vuyk Espinola, Cecilia Maria
    Lezcano, Jose
    Chamorro, Romilio
    [J]. REVISTA DEL CLAD REFORMA Y DEMOCRACIA, 2021, (81) : 251 - 278
  • [42] DEVELOPING A TRANSNATIONAL ONLINE BLENDED LEARNING MODULE - LESSONS LEARNED FROM THE PILOT PHASE
    Hourican, S.
    Lehwaldt, D.
    Kelly, M.
    Doyle, P.
    Glenn, M.
    Wiedermann, F.
    [J]. 12TH INTERNATIONAL CONFERENCE OF EDUCATION, RESEARCH AND INNOVATION (ICERI2019), 2019, : 6909 - 6909
  • [43] Project THRIVE: Lessons Learned from Developing an Intervention for Young Adults with Chronic Illnesses
    Porter, Danielle
    Herrera, Christian
    Howie, Whitney
    Maye, Caitlyn
    Quintero, Sofia
    Cheung, Charlize
    Thurston, Idia
    [J]. JOURNAL OF PEDIATRIC PSYCHOLOGY, 2023, 48 : 115 - 116
  • [44] Lessons learned from Aviation Safety
    Eherts, David M.
    [J]. JOURNAL OF SAFETY RESEARCH, 2008, 39 (02) : 141 - 142
  • [45] Lessons learned from safety events
    Weiner, Steven C.
    Fassbender, Linda L.
    [J]. INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2012, 37 (22) : 17358 - 17363
  • [46] Scientific Literature Indicators Of Lessons Learned In Project Management
    Guzzo, Claudia Hofart
    Maccari, Emerson Antonio
    Quoniam, Luc
    [J]. REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY, 2014, 14 (02): : 5 - 24
  • [47] Two decades of project management research: Lessons learned
    Gupta, UG
    [J]. CHALLENGES OF INFORMATION TECHNOLOGY MANAGEMENT IN THE 21ST CENTURY, 2000, : 1194 - 1195
  • [48] DESIGN AND PROJECT MANAGEMENT ROBOTICS EDUCATION: LESSONS LEARNED
    Acuna Zuniga, Ana Lourdes
    [J]. EDUCATION IN THE KNOWLEDGE SOCIETY, 2012, 13 (03): : 6 - 27
  • [49] Lessons learned: 12 steps to project risk reduction
    不详
    [J]. HYDROCARBON PROCESSING, 2008, 87 (06): : 29 - 29
  • [50] Project management - Lessons learned from introducing a multitask environmental worker program
    PischkeWinn, K
    Minnick, A
    [J]. JOURNAL OF NURSING ADMINISTRATION, 1996, 26 (06): : 31 - 38