Joint Optimization of Forward Contract and Operating Rules for Cascade Hydropower Reservoirs

被引:8
|
作者
Li, Xiao [1 ]
Liu, Pan [1 ]
Ming, Bo [2 ]
Huang, Kangdi [1 ]
Xu, Weifeng [1 ]
Wen, Yan [3 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[2] Xian Univ Technol, State Key Lab Ecohydraul Northwest Arid Reg, Xian 710048, Peoples R China
[3] Hubei Qingjiang Hydropower Dev Co Ltd, Dongshan Ave, Yichang 443000, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydropower contract; Operating rules; Cascade reservoirs; Electricity market; Deterministic operation; GENETIC ALGORITHM; RISK-MANAGEMENT; GENERATION; SYSTEMS; DERIVATION; MODEL; WATER; PRICE;
D O I
10.1061/(ASCE)WR.1943-5452.0001510
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Forward contract is a useful tool for hydropower producers to hedge revenue uncertainty sourced from varied spot prices. However, few studies have been explored to jointly derive the optimal forward contract and operating rules to guide hydropower operations. To address this issue, the following steps for cascade reservoirs are proposed: (1) a two-layer nested approach is used to derive optimal contract targets coordinated with operation trajectory (saying reservoir water level time series) by inputting deterministic inflows, (2) the forms of the operating rules are then identified based on the optimal operation trajectory from the first step, and (3) a simulation-based optimization approach is used to jointly refine the optimal contract and operating rules with the forms identified in the second step. With China's Hubei Province as the market boundary, the Qing River cascade reservoir system was selected as the case study. The results show that (1) the two-layer nested approach could find the optimal deterministic operation together with contract targets; (2) the total cascade output is related to both available energy and spot price, with the coefficients of determination for each month mostly greater than 0.5; and (3) the refined operating rules and contract effectively improved the annual hydropower revenue by 3.65% ($14.15 million) compared to that of the conventional operating rules. The proposed method to jointly derive forward contract and operating rules is helpful for gaining more revenue under long-term hydropower operations.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] Research on Joint Bidding Mechanism of Cascade Hydropower
    Liu, Lei
    Zhu, Gangyi
    Li, Jun
    Li, Xiaolu
    Tang, Chengpeng
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON ROBOTICS, CONTROL AND AUTOMATION ENGINEERING (RAE 2018) AND INTERNATIONAL CONFERENCE ON ADVANCED MECHANICAL AND ELECTRICAL ENGINEERING (AMEE 2018), 2018, : 76 - 80
  • [22] Operation Rules Optimization of Cascade Reservoirs Based on Multi-Objective Tangent Algorithm
    Li, Jie
    Qin, Hui
    Zhang, Zhendong
    Yao, Liqiang
    Gul, Eid
    Jiang, Zhiqiang
    Wang, Yongqiang
    Mo, Li
    Pei, Shaoqian
    Zhu, Longjun
    IEEE ACCESS, 2019, 7 : 161949 - 161962
  • [23] Peak operation optimization of cascade hydropower reservoirs and solar power plants considering output forecasting uncertainty
    Feng, Zhong-kai
    Huang, Qing-qing
    Niu, Wen-jing
    Su, Hua-ying
    Li, Shu-shan
    Wu, Hui-jun
    Wang, Jia-yang
    APPLIED ENERGY, 2024, 358
  • [24] Monthly Operation Optimization of Cascade Hydropower Reservoirs with Dynamic Programming and Latin Hypercube Sampling for Dimensionality Reduction
    Zhong-kai Feng
    Wen-jing Niu
    Zhi-qiang Jiang
    Hui Qin
    Zhen-guo Song
    Water Resources Management, 2020, 34 : 2029 - 2041
  • [25] Monthly Operation Optimization of Cascade Hydropower Reservoirs with Dynamic Programming and Latin Hypercube Sampling for Dimensionality Reduction
    Feng, Zhong-kai
    Niu, Wen-jing
    Jiang, Zhi-qiang
    Qin, Hui
    Song, Zhen-guo
    WATER RESOURCES MANAGEMENT, 2020, 34 (06) : 2029 - 2041
  • [26] Optimal Energy Storage Operation Chart and Output Distribution of Cascade Reservoirs Based on Operating Rules Derivation
    Yuxin Zhu
    Jianzhong Zhou
    Yongchuan Zhang
    Zhiqiang Jiang
    Benjun Jia
    Wei Fang
    Water Resources Management, 2022, 36 : 5751 - 5766
  • [27] Optimal Energy Storage Operation Chart and Output Distribution of Cascade Reservoirs Based on Operating Rules Derivation
    Zhu, Yuxin
    Zhou, Jianzhong
    Zhang, Yongchuan
    Jiang, Zhiqiang
    Jia, Benju
    Fang, Wei
    WATER RESOURCES MANAGEMENT, 2022, 36 (14) : 5751 - 5766
  • [28] Derived operating rules for reservoirs in series or in parallel
    Lund, JR
    Guzman, J
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1999, 125 (03): : 143 - 153
  • [29] Derived operating rules for reservoirs in series or in parallel
    Dept. of Civ. and Envir. Engrg., Univ. of California, Davis, CA 95616, United States
    不详
    J. Water Resour. Plann. Manage., 3 (143-153):
  • [30] The effect of hydropower on fish stocks: comparison between cascade and non-cascade reservoirs
    V. Draštík
    J. Kubečka
    M. Tušer
    M. Čech
    J. Frouzová
    O. Jarolím
    M. Prchalová
    Hydrobiologia, 2008, 609