Peak operation optimization of cascade hydropower reservoirs and solar power plants considering output forecasting uncertainty

被引:3
|
作者
Feng, Zhong-kai [1 ,2 ]
Huang, Qing-qing [2 ]
Niu, Wen-jing [3 ]
Su, Hua-ying [4 ]
Li, Shu-shan [5 ]
Wu, Hui-jun [5 ]
Wang, Jia-yang [6 ]
机构
[1] Hohai Univ, Natl Key Lab Water Disaster Prevent, Nanjing 210098, Peoples R China
[2] Hohai Univ, Coll Hydrol & Water Resources, Nanjing 210098, Peoples R China
[3] ChangJiang Water Resources Commiss, Bur Hydrol, Wuhan 430010, Peoples R China
[4] Guizhou Power Grid Co Ltd, Power Dispatching Control Ctr, Guiyang 550499, Guizhou, Peoples R China
[5] China Southern Power Grid, Power Dispatching & Control Ctr, Guangzhou 510663, Peoples R China
[6] China Southern Power Grid, Power Res Inst, Guangzhou 510080, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydropower-solar complementary operation; Solar output scenario generation; Principal component analysis; Cooperation search algorithm; SHAVING OPERATION; WIND; HYBRID; SYSTEM; MODEL; COMPLEMENTARITY;
D O I
10.1016/j.apenergy.2023.122533
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
With the rapid development and utilization of hydropower and photovoltaic energy, the complementary operation of hydropower and solar power has become one of the research hotspots in the electric power system. However, the uncertainty of photovoltaic energy output significantly increases the difficulty of the complementary operation. This study focuses on the peak operation optimization of cascade hydropower reservoirs and solar power plants considering output forecasting uncertainty. Firstly, through principal component analysis and pattern clustering, the forecasting errors of historical dataset are used to generate typical solar output scenarios. Secondly, an efficient cooperation search algorithm is used to minimize the variance of the residual load series, taking into account the occurrence probabilities of solar output scenarios. Finally, the maximum value, peakvalley difference, standard deviation and load rate of the residual load are selected as the performance evaluation indexes. The peak load regulation ability of the proposed method is tested under different typical solar output scenarios. The results demonstrate that the proposed method can scientifically find the scheduling plan of hydropower-solar complementary system, reducing the photovoltaic energy integration risk.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Cooperation Search Algorithm for Power Generation Production Operation Optimization of Cascade Hydropower Reservoirs
    Wen-jing Niu
    Zhong-kai Feng
    Yu-rong Li
    Shuai Liu
    Water Resources Management, 2021, 35 : 2465 - 2485
  • [2] Cooperation Search Algorithm for Power Generation Production Operation Optimization of Cascade Hydropower Reservoirs
    Niu, Wen-jing
    Feng, Zhong-kai
    Li, Yu-rong
    Liu, Shuai
    WATER RESOURCES MANAGEMENT, 2021, 35 (08) : 2465 - 2485
  • [3] Study on optimization of the short-term operation of cascade hydropower stations by considering output error
    Wang, Liping
    Wang, Boquan
    Zhang, Pu
    Liu, Minghao
    Li, Chuangang
    JOURNAL OF HYDROLOGY, 2017, 549 : 326 - 339
  • [4] Medium-term peak shaving operation of cascade hydropower plants considering water delay time
    Liao, Shengli
    Liu, Huan
    Liu, Zhanwei
    Liu, Benxi
    Li, Gang
    Li, Shushan
    RENEWABLE ENERGY, 2021, 179 : 406 - 417
  • [5] Optimal Operation Model of Cascade Hydropower Plants Before Flood Season Considering Daily Peak Shaving Demand
    Zhang Z.
    Cheng C.
    Wu X.
    Li Z.
    Zhang C.
    Dianwang Jishu/Power System Technology, 2022, 46 (09): : 3477 - 3484
  • [6] Cascade hydropower plants operation considering comprehensive ecological water demands
    Zhang, Hongxue
    Chang, Jianxia
    Gao, Chao
    Wu, Hongshi
    Wang, Yimin
    Lei, Kaixuan
    Long, Ruihao
    Zhang, Lianpeng
    ENERGY CONVERSION AND MANAGEMENT, 2019, 180 : 119 - 133
  • [7] Optimization Scheduling of Virtual Power Plants Considering Source-Load Coordinated Operation and Wind-Solar Uncertainty
    Cao, Wensi
    Yu, Jinhang
    Xu, Mingming
    PROCESSES, 2024, 12 (01)
  • [8] Total output operation chart optimization of cascade reservoirs and its application
    Jiang, Zhiqiang
    Ji, Changming
    Sun, Ping
    Wang, Liping
    Zhang, Yanke
    ENERGY CONVERSION AND MANAGEMENT, 2014, 88 : 296 - 306
  • [9] Short term optimization of cascade reservoirs operation considering flow routing
    Xu, Bin
    Zhong, Ping-an
    Zhang, Mengran
    Zhang, Jinhua
    2012 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2012,
  • [10] Application of improved multistage optimization method for optimal reservoirs operation of cascade hydropower stations
    School of Environmental Science and Engineering, Chang'an University, Xi'an 710054, China
    不详
    不详
    Shuili Fadian Xuebao, 2007, 6 (1-6+11):