Peak operation optimization of cascade hydropower reservoirs and solar power plants considering output forecasting uncertainty

被引:3
|
作者
Feng, Zhong-kai [1 ,2 ]
Huang, Qing-qing [2 ]
Niu, Wen-jing [3 ]
Su, Hua-ying [4 ]
Li, Shu-shan [5 ]
Wu, Hui-jun [5 ]
Wang, Jia-yang [6 ]
机构
[1] Hohai Univ, Natl Key Lab Water Disaster Prevent, Nanjing 210098, Peoples R China
[2] Hohai Univ, Coll Hydrol & Water Resources, Nanjing 210098, Peoples R China
[3] ChangJiang Water Resources Commiss, Bur Hydrol, Wuhan 430010, Peoples R China
[4] Guizhou Power Grid Co Ltd, Power Dispatching Control Ctr, Guiyang 550499, Guizhou, Peoples R China
[5] China Southern Power Grid, Power Dispatching & Control Ctr, Guangzhou 510663, Peoples R China
[6] China Southern Power Grid, Power Res Inst, Guangzhou 510080, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydropower-solar complementary operation; Solar output scenario generation; Principal component analysis; Cooperation search algorithm; SHAVING OPERATION; WIND; HYBRID; SYSTEM; MODEL; COMPLEMENTARITY;
D O I
10.1016/j.apenergy.2023.122533
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
With the rapid development and utilization of hydropower and photovoltaic energy, the complementary operation of hydropower and solar power has become one of the research hotspots in the electric power system. However, the uncertainty of photovoltaic energy output significantly increases the difficulty of the complementary operation. This study focuses on the peak operation optimization of cascade hydropower reservoirs and solar power plants considering output forecasting uncertainty. Firstly, through principal component analysis and pattern clustering, the forecasting errors of historical dataset are used to generate typical solar output scenarios. Secondly, an efficient cooperation search algorithm is used to minimize the variance of the residual load series, taking into account the occurrence probabilities of solar output scenarios. Finally, the maximum value, peakvalley difference, standard deviation and load rate of the residual load are selected as the performance evaluation indexes. The peak load regulation ability of the proposed method is tested under different typical solar output scenarios. The results demonstrate that the proposed method can scientifically find the scheduling plan of hydropower-solar complementary system, reducing the photovoltaic energy integration risk.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] An MILP Model for Short-term Peak Shaving Operation of Cascaded Hydropower Plants Considering Unit Commitment
    Su, Chengguo
    Cheng, Chuntian
    Wang, Peilin
    2018 IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2018 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2018,
  • [42] STUDY ON OPTIMISED OPERATION MODE CONSIDERING ECOLOGICAL DISCHARGE FOR CASCADE HYDROPOWER SYSTEM TO PARTICIPATE IN POWER MARKET
    Zhang Yong-Feng
    Ma Guang-Wen
    Li Ji-Dong
    JOURNAL OF ENVIRONMENTAL PROTECTION AND ECOLOGY, 2021, 22 (04): : 1617 - 1629
  • [43] Study on Optimal Operation for Concentrating Solar Power Plants Considering Wind Power Reduction
    Yuan, Guochun
    Guo, Panfeng
    2020 6TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, PTS 1-5, 2020, 546
  • [44] The Research of United Optimal Operation Aid Decision System for Cascade Hydropower Plants in Local Power Network
    Zhong Wei
    Song Yang
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 316 - +
  • [45] The Cascade Reservoirs Multi-Objective Ecological Operation Optimization Considering Different Ecological Flow Demand
    Yang, Zhe
    Yang, Kan
    Hu, Hu
    Su, Lyuwen
    WATER RESOURCES MANAGEMENT, 2019, 33 (01) : 207 - 228
  • [46] The Cascade Reservoirs Multi-Objective Ecological Operation Optimization Considering Different Ecological Flow Demand
    Zhe Yang
    Kan Yang
    Hu Hu
    Lyuwen Su
    Water Resources Management, 2019, 33 : 207 - 228
  • [47] Short-term optimal scheduling of cascade hydropower plants shaving peak load for multiple power grids
    Wang, Peilin
    Yuan, Wenlin
    Su, Chengguo
    Wu, Yang
    Lu, Lu
    Yan, Denghua
    Wu, Zening
    RENEWABLE ENERGY, 2022, 184 : 68 - 79
  • [48] Optimal Operation of Virtual Power Plant Considering Environmental Externality and Output Uncertainty of Wind and Photovoltaic Power
    Sun J.
    Wang Y.
    Guo X.
    Zhou Y.
    Wang Y.
    Xue W.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2022, 46 (08): : 50 - 59
  • [49] Analysis of a Stochastic Programming Model for Optimal Hydropower System Operation under a Deregulated Electricity Market by Considering Forecasting Uncertainty
    Xu, Bin
    Zhong, Ping-An
    Du, Baoyi
    Chen, Juan
    Liu, Weifeng
    Li, Jieyu
    Guo, Le
    Zhao, Yunfa
    WATER, 2018, 10 (07)
  • [50] Combining Floating Solar Photovoltaic Power Plants and Hydropower Reservoirs: A Virtual Battery of Great Global Potential
    Farfan, Javier
    Breyer, Christian
    12TH INTERNATIONAL RENEWABLE ENERGY STORAGE CONFERENCE, IRES 2018, 2018, 155 : 403 - 411