Short-term optimal scheduling of cascade hydropower plants shaving peak load for multiple power grids

被引:26
|
作者
Wang, Peilin [1 ]
Yuan, Wenlin [1 ]
Su, Chengguo [1 ]
Wu, Yang [2 ]
Lu, Lu [1 ]
Yan, Denghua [1 ,3 ]
Wu, Zening [1 ]
机构
[1] Zhengzhou Univ, Sch Hydraul Sci & Engn, Zhengzhou 450001, Peoples R China
[2] Yunnan Power Grid Co Ltd, Power Dispatching & Control Ctr, Kunming 650011, Yunnan, Peoples R China
[3] China Inst Water Resources & Hydropower Res, Water Resources Dept, Beijing 100038, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Cascade hydropower plants; Peak shaving; Regional power grid; Mixed-integer linear programming; UNIT COMMITMENT; OPERATION; OPTIMIZATION; GENERATION; SYSTEM; PERFORMANCE; ENERGY; MODEL; WIND;
D O I
10.1016/j.renene.2021.10.079
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Cascade hydropower plants which have good regulation performance and are managed by the dis-patching center of regional power grids are usually required to simultaneously shave the peak load for multiple provincial power grids, which is an important way of relieving the growing peak shaving pressure on power grids in central and eastern China. This paper establishes an optimization model for the short-term generation scheduling of cascade hydropower plants in regional power grids. In this model, minimizing the peak-valley load difference of multiple power grids is adopted as the objective function. In addition to conventional hydraulic constraints, the operation constraints of individual hy-dropower units, electrical constraints and head effect on the power generation are all considered to obtain precise scheduling. The original nonlinear and non-convex model is converted into a standard mixed-integer linear programming (MILP) formulation through several linearization strategies. The re-sults for the real-world case study indicate that: 1) the proposed model is computationally efficient with a calculation time of 326 s; 2) the peak-valley differences of the Shanghai Power Grid and Zhejiang Power Grid decreased by 9.71% and 2.29%, respectively; 3) compared with actual operation, the proposed model shows better performance in peak shaving for multiple provincial power grids. (c) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页码:68 / 79
页数:12
相关论文
共 50 条
  • [1] Short-term peak shaving operation for multiple power grids with pumped storage power plants
    Cheng, Chun-Tian
    Cheng, Xiong
    Shen, Jian-Jian
    Wu, Xin-Yu
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 67 : 570 - 581
  • [2] Short-Term Peak-Shaving Operation of Single-Reservoir and Multicascade Hydropower Plants Serving Multiple Power Grids
    Shengli Liao
    Yan Zhang
    Jie Liu
    Benxi Liu
    Zhanwei Liu
    [J]. Water Resources Management, 2021, 35 : 689 - 705
  • [3] Short-Term Peak-Shaving Operation of Single-Reservoir and Multicascade Hydropower Plants Serving Multiple Power Grids
    Liao, Shengli
    Zhang, Yan
    Liu, Jie
    Liu, Benxi
    Liu, Zhanwei
    [J]. WATER RESOURCES MANAGEMENT, 2021, 35 (02) : 689 - 705
  • [4] Multiobjective Scheduling Method for Short-Term Peak Shaving Operation of Cascade Hydro Plants
    Zhou, Lingan
    Cheng, Chuntian
    Liao, Shengli
    Wang, Jian
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2020, 146 (09)
  • [5] An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids
    Cheng, Chuntian
    Su, Chengguo
    Wang, Peilin
    Shen, Jianjian
    Lu, Jianyu
    Wu, Xinyu
    [J]. ENERGY, 2018, 163 : 722 - 733
  • [6] Short-term optimal scheduling of cascade hydropower plants with reverse-regulating effects
    Su, Chengguo
    Wang, Peilin
    Yuan, Wenlin
    Wu, Yang
    Jiang, Feng
    Wu, Zening
    Yan, Denghua
    [J]. RENEWABLE ENERGY, 2022, 199 : 395 - 406
  • [7] A CompactMILP Model for Short-Term Peak Shaving of Cascaded Hydropower Plants ConsideringUnitCommitment
    考虑机组组合的梯级水电站短期调峰MILP模型
    [J]. Wu, Xinyu (wuxinyu@dlut.edu.cn), 1883, Power System Technology Press (42):
  • [8] Short-term operation of cascade hydropower system sharing flexibility via high voltage direct current lines for multiple grids peak shaving
    Liu, Benxi
    Liu, Tengyuan
    Liao, Shengli
    Wang, Haidong
    Jin, Xiaoyu
    [J]. RENEWABLE ENERGY, 2023, 213 : 11 - 29
  • [9] MILP model for short-term peak shaving of multi-grids using cascade hydropower considering discrete HVDC constraints
    Liao, Shengli
    Xiong, Jiang
    Liu, Benxi
    Cheng, Chuntian
    Zhou, Binbin
    Wu, Yuqiang
    [J]. RENEWABLE ENERGY, 2024, 235
  • [10] Discussion on the short-term weekly optimal scheduling of cascade hydropower stations
    Li, Liang
    Zhou, Yun
    Huang, Qiang
    [J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (04): : 38 - 42