Beam position monitor system for PEP-II

被引:0
|
作者
Smith, SR [1 ]
Aiello, GR [1 ]
Hendrickson, LJ [1 ]
Johnson, RG [1 ]
Mills, MR [1 ]
Olsen, JJ [1 ]
机构
[1] Stanford Linear Accelerator Ctr, Stanford, CA 94309 USA
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
We describe the beam position monitor system built for PEP-II, the B-factory at SLAG. The system reports beam position for bunches of between 5 x 10(8) and 8 x 10(10) electron charges, either singly or as continuous streams of bunches every 4.2 ns. Resolution at full charge is to be better than 10 microns in a single turn. Higher resolution is available via on-board multi-turn averaging. The position signal is processed in a 20 MHz bandwidth around 952 MHz. This bandwidth, rather broader than that typical of RF position monitors, allows good resolution for low charge single bunches. Additional novel features include stringent control of return losses in order to minimize cross-talk between nearby bunches which may contain very different charges. The digitizing electronics is multiplexed between the two PER-Il storage rings. Design, construction, and installation experience, as well as first results with beam are presented.
引用
收藏
页码:2122 / 2124
页数:3
相关论文
共 50 条
  • [21] Turn-by-turn imaging of the transverse beam profile in PEP-II
    Fisher, Alan S.
    Petree, Mark
    Kraus, Richard
    Au, Yat-Shan
    Chan, Benny
    BEAM INSTRUMENTATION WORKSHOP 2006, 2006, 868 : 303 - +
  • [22] Design and initial commissioning of beam diagnostics for the PEP-II B Factory
    Fisher, A.S.
    Alzofon, D.
    Arnett, D.
    Bong, E.L.
    Brugnoletti, B.
    Collins, B.
    Daly, E.
    Gioumousis, A.
    Johnson, R.
    Kulikov, A.
    Kurita, N.
    Langton, J.
    McCormick, D.
    Noriega, R.
    Smith, S.
    Proceedings of the IEEE Particle Accelerator Conference, 1998, 2 : 2253 - 2255
  • [23] Design and initial commissioning of beam diagnostics for the PEP-II B factory
    Fisher, AS
    Alzofon, D
    Arnett, D
    Bong, EL
    Brugnoletti, B
    Collins, B
    Daly, E
    Gioumousis, A
    Johnson, R
    Kulikov, A
    Kurita, N
    Langton, J
    McCormick, D
    Noriega, R
    Smith, S
    Smith, V
    Stege, R
    Bjork, M
    Chin, M
    Hinkson, J
    McGill, R
    Suwada, T
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 2253 - 2255
  • [24] Lifetime and tail simulations for beam-beam effects in PEP-II B factory
    Shatilov, DN
    Zholents, AA
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 2892 - 2894
  • [25] Design of the PEP-II low energy ring vacuum system
    Hunt, D
    Kennedy, K
    Stevens, T
    PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 2067 - 2068
  • [26] The abort kicker system for the PEP-II storage rings at SLAC
    de Lamare, JE
    PPC-2003: 14TH IEEE INTERNATIONAL PULSED POWER CONFERENCE, VOLS 1 AND 2, DIGEST OF TECHNICAL PAPERS, 2003, : 1419 - 1422
  • [27] PEP-II and KEKB operational status
    Seeman, J
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 572 - 576
  • [28] KEKB and PEP-II B factories
    Seeman, JT
    NUCLEAR PHYSICS B, 1997, : 51 - 60
  • [29] The PEP-II collider and commissioning detectors
    Mattison, TS
    NUCLEAR PHYSICS B, 1997, : 310 - 314
  • [30] Upgrades to PEP-II tune measurements
    Fisher, AS
    Petree, M
    Wienands, U
    Allison, S
    Laznovsky, M
    Seeman, M
    Robin, J
    BEAM INSTRUMENTATION WORKSHOP 2002, 2002, 648 : 267 - 274