共 50 条
- [21] Turn-by-turn imaging of the transverse beam profile in PEP-II BEAM INSTRUMENTATION WORKSHOP 2006, 2006, 868 : 303 - +
- [22] Design and initial commissioning of beam diagnostics for the PEP-II B Factory Proceedings of the IEEE Particle Accelerator Conference, 1998, 2 : 2253 - 2255
- [23] Design and initial commissioning of beam diagnostics for the PEP-II B factory PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 2253 - 2255
- [24] Lifetime and tail simulations for beam-beam effects in PEP-II B factory PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 2892 - 2894
- [25] Design of the PEP-II low energy ring vacuum system PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 2067 - 2068
- [26] The abort kicker system for the PEP-II storage rings at SLAC PPC-2003: 14TH IEEE INTERNATIONAL PULSED POWER CONFERENCE, VOLS 1 AND 2, DIGEST OF TECHNICAL PAPERS, 2003, : 1419 - 1422
- [27] PEP-II and KEKB operational status 2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 572 - 576