共 50 条
- [21] FIXTURE PLANNING WITH FRICTION [J]. JOURNAL OF ENGINEERING FOR INDUSTRY-TRANSACTIONS OF THE ASME, 1991, 113 (03): : 320 - 327
- [24] Automatic clamp planning approach for holes-system modular fixture system [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (01): : 100 - 104
- [25] AN INTEGRATED SYSTEM FOR PLANNING, AND EDUCATION IN PLANNING [J]. EKISTICS-THE PROBLEMS AND SCIENCE OF HUMAN SETTLEMENTS, 1989, 56 (338-39): : 362 - 366
- [26] An adaptive fixture design system for integrated product and process design [J]. 2005 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2005, : 87 - 92
- [27] An integrated computer-aided fixture design system for a FMS [J]. PROGRESS OF CUTTING AND GRINDING: WITH SOME TOPICS IN ADVANCED MANUFACTURE TECHNOLOGY, 1998, : 497 - 501
- [28] Automated setup and fixture planning system for box-shaped parts [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (5-6): : 540 - 552
- [29] Automated setup and fixture planning system for box-shaped parts [J]. The International Journal of Advanced Manufacturing Technology, 2009, 45 : 540 - 552
- [30] Stability ofWorkpkce Setup in Feature-Based Fixture Planning System [J]. CADDM, 2002, (02) : 37 - 43