Identifying the significant factors affecting the masonry labour productivity in building construction projects in India

被引:9
|
作者
Karthik, Dasari [1 ]
Rao, C. B. Kameswara [1 ]
机构
[1] Natl Inst Technol Warangal, Civil Engn Dept, Warangal, Telangana, India
关键词
Masonry labour; labour productivity; factors; building construction; India; WORKERS;
D O I
10.1080/15623599.2019.1631978
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Masonry workers on construction sites carry out various jobs under constraints and challenges while meeting their targets. These constraints are linked with certain factors that critically affect the masonry labour productivity. Addressing these factors by relative ranking will aid in providing clear knowledge of improving the productivity of masonry labour in building construction, which is a dire necessity in developing countries like India. The objective of this article is to identify and rank the significance of factors affecting masonry labour productivity in building construction projects in India. For this purpose, a structured questionnaire survey with 38 factors that were observed as adversely affecting the masonry labour productivity was prepared and collected opinions from 120 construction site personnel working in various organisations in Telangana state. These 38 factors were categorized into five groups, namely: (1) work force, (2) management team, (3) working condition, (4) material and equipment, (5) unforeseen and unfamiliar factors. All the factors within these groups were analysed using Relative Importance Index (RII) technique. Average score of RII at group level is calculated. Work force-related factors were found to be the majority affecting factors with average RII of 78.4%. Major factors in the top five list with RII > 0.8 were related to work force and working conditions. The results obtained from ranking the factors gives good opportunity in choosing the significant factors as predictors for developing a model for masonry labour productivity valuation. Productivity valuations can aid the construction personnel in developing and managing the masonry labour productivity benchmarks in building construction projects.
引用
收藏
页码:464 / 472
页数:9
相关论文
共 50 条
  • [1] Identifying factors affecting construction labour productivity in India and measures to improve productivity
    Agrawal A.
    Halder S.
    [J]. Asian Journal of Civil Engineering, 2020, 21 (4) : 569 - 579
  • [2] The Analysis of Essential Factors Responsible for Loss of Labour Productivity in Building Construction Projects in India
    Karthik, Dasari
    Rao, C. B. K.
    [J]. ENGINEERING JOURNAL-THAILAND, 2019, 23 (02): : 55 - 70
  • [3] Organisational Factors Affecting the Productivity of Labour in Sri Lankan Building Construction Projects: Perspective of Engineers
    Kesavan, M.
    Dissanayake, P. B. G.
    Pathirana, C. K.
    Deegahawature, M. M. D. R.
    Silva, K. D. R.
    [J]. ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2022, 55 (03): : 101 - 112
  • [4] Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore
    Hwang, Bon-Gang
    Zhu, Lei
    Ming, Jonathan Tan Tzu
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (03)
  • [5] Factors affecting construction labour productivity in Yemen
    Alaghbari, Wael
    Al-Sakkaf, Abubaker A.
    Sultan, Basel
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (01) : 79 - 91
  • [6] Labour productivity in Australian building construction projects: a roadmap for improvement
    Nasirzadeh, Farnad
    Rostamnezhad, Mozhdeh
    Carmichael, David G.
    Khosravi, Abbas
    Aisbett, Brad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (11) : 2079 - 2088
  • [7] Conceptual Framework Factors Affecting Construction Labour Productivity
    Nurhendi, Revianty Nurmeyliandari
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    [J]. JURNAL KEJURUTERAAN, 2022, 34 (01): : 89 - 99
  • [8] A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN
    Ghoddousi, Parviz
    Hosseini, Mohammad Reza
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2012, 18 (01) : 99 - 116
  • [9] Buildability factors affecting formwork labour productivity of building floors
    Jarkas, Abdulaziz M.
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (10) : 1383 - 1394
  • [10] Factors affecting construction labour productivity: a case study of Jordan
    Hiyassat, Mohammed A.
    Hiyari, Montaser A.
    Sweis, Ghaleb J.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2016, 16 (02) : 138 - 149