The Analysis of Essential Factors Responsible for Loss of Labour Productivity in Building Construction Projects in India

被引:7
|
作者
Karthik, Dasari [1 ]
Rao, C. B. K. [1 ]
机构
[1] Natl Inst Technol Warangal, Dept Civil Engn, Warangal, Andhra Pradesh, India
来源
ENGINEERING JOURNAL-THAILAND | 2019年 / 23卷 / 02期
关键词
Labour productivity; construction productivity; activity; task; work measurement; time and motion study; construction industry;
D O I
10.4186/ej.2019.23.2.55
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The purpose of this paper is to find the essential factors influencing the loss of labour productivity (LP) in construction in India and substantiate these factors with naturalistic observation method in a building construction project. From the past studies, factors influencing the LP are specifically selected for the survey and statistically analyzed to form into defined group of factors. The influence of these factors is then correlated to the field level LP. For this, a case study is conducted using TMS technique to inspect factors influencing LP in an ongoing multi storied residential building construction site in Telangana State, India. The LP factors identified by survey analysis are quantitatively validated with the field study. It is noted that work characteristics, organizational characteristics, assured and safety work and workers management were responsible for 15% loss of LP in the field. Of these, major loss of about 11% is shown by work characteristics factors such as material delay and tools delay. This method can be utilized by construction personnel to measure the loss of LP with the data available from survey methods and also assists the construction personnel in making timely decisions towards the improvement of LP for various activities on the construction project sites.
引用
收藏
页码:55 / 70
页数:16
相关论文
共 50 条
  • [1] Identifying the significant factors affecting the masonry labour productivity in building construction projects in India
    Karthik, Dasari
    Rao, C. B. Kameswara
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (03) : 464 - 472
  • [2] Labour productivity in Australian building construction projects: a roadmap for improvement
    Nasirzadeh, Farnad
    Rostamnezhad, Mozhdeh
    Carmichael, David G.
    Khosravi, Abbas
    Aisbett, Brad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (11) : 2079 - 2088
  • [3] Organisational Factors Affecting the Productivity of Labour in Sri Lankan Building Construction Projects: Perspective of Engineers
    Kesavan, M.
    Dissanayake, P. B. G.
    Pathirana, C. K.
    Deegahawature, M. M. D. R.
    Silva, K. D. R.
    [J]. ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2022, 55 (03): : 101 - 112
  • [4] Identification and comparative analysis of key parameters influencing construction labour productivity in building and industrial projects
    Tsehayae, Abraham Assefa
    Fayek, Aminah Robinson
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2014, 41 (10) : 878 - 891
  • [5] Identifying factors affecting construction labour productivity in India and measures to improve productivity
    Agrawal A.
    Halder S.
    [J]. Asian Journal of Civil Engineering, 2020, 21 (4) : 569 - 579
  • [6] Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore
    Hwang, Bon-Gang
    Zhu, Lei
    Ming, Jonathan Tan Tzu
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (03)
  • [7] Construction materials management practices enhancing labour productivity in multi-storey building projects
    Gurmu, Argaw Tarekegn
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (01) : 77 - 86
  • [8] Impact of labour productivity in estimating the duration of construction projects
    Selvam, Gopinath
    Madhavi, T. Ch.
    Naazeema Begum, T. P.
    Sudheesh, Monish
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (12) : 2398 - 2404
  • [9] BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT
    Bhatti, Imtiaz Ali
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Bhatti, Nabi Bux
    Lakhiar, Muhammad Tahir
    Mahar, Muntazir Mahdi
    [J]. JOURNAL OF APPLIED ENGINEERING SCIENCES, 2019, 9 (02) : 125 - 130
  • [10] OPTIMISATION OF LABOUR-INTENSIVE PRODUCTIVITY FOR CONSTRUCTION PROJECTS IN GHANA
    Bamfo-Agyei, Emmanuel
    Thwala, Didibhuku Wellington
    Aigbavboa, Clinton
    [J]. ACTA STRUCTILIA, 2023, 30 (01) : 122 - 154