Factors affecting construction labour productivity: a case study of Jordan

被引:64
|
作者
Hiyassat, Mohammed A. [1 ]
Hiyari, Montaser A. [2 ]
Sweis, Ghaleb J. [1 ]
机构
[1] Univ Jordan, Dept Civil Engn, Amman, Jordan
[2] Al Ahliyya Amman Univ, Dept Architecture, Al Salt, Jordan
关键词
construction industry; Jordan; labour productivity; factor analysis; construction labour;
D O I
10.1080/15623599.2016.1142266
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Improving productivity in construction is a way of increasing profit with little or no increase in cost. Labour productivity in construction in developing countries, including Jordan, is relatively low and needs to be improved significantly. The objective of this paper is to describe and analyse the factors that affect construction labour productivity. To achieve this goal, a questionnaire survey containing 27 questions (variables) was conducted. It was sent to 200 engineers and foremen who work for contractors. The 90 returned responses were statistically analysed by calculating the average, standard deviation, and RII of each variable. The results of a Spearman correlationrankcoefficient test showed that no significant differences existed between the responses of the engineers and foremen. It was concluded that the top three ranked dimensions were Productivity increases as experience increases', Financial incentives increase productivity', and Trust and communications between management and workers increase productivity'. Furthermore, the data was analysed using the principal components method of factor analysis. Of the 11 extracted factors, only five were considered, while the others were dropped since the observed variables had low loadings on these factors. Contractors and officials can benefit from this study in understanding factors affecting productivity, and act upon that understanding.
引用
收藏
页码:138 / 149
页数:12
相关论文
共 50 条
  • [1] EVALUATION OF FACTORS AFFECTING LABOUR PRODUCTIVITY IN CONSTRUCTION INDUSTRY: A CASE STUDY
    Muhammad, Nasiru Zakari
    Sani, Ashiru
    Muhammad, Ahmad
    Balubaid, Saeed
    Ituma, Egba Ernest
    Suleiman, Jibrin Hassan
    [J]. JURNAL TEKNOLOGI, 2015, 77 (12): : 87 - 91
  • [2] A hybrid framework to model factors affecting construction labour productivity Case study of Iran
    Jalal, Majid Parchami
    Shoar, Shahab
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2019, 24 (03) : 630 - 654
  • [3] Factors affecting construction labour productivity in Yemen
    Alaghbari, Wael
    Al-Sakkaf, Abubaker A.
    Sultan, Basel
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (01) : 79 - 91
  • [4] Conceptual Framework Factors Affecting Construction Labour Productivity
    Nurhendi, Revianty Nurmeyliandari
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    [J]. JURNAL KEJURUTERAAN, 2022, 34 (01): : 89 - 99
  • [5] Factors Influencing Construction Labour Productivity: An Indian Case Study
    Thomas, Anu V.
    Sudhakumar, J.
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2014, 19 (01) : 53 - 68
  • [6] Factors Affecting Construction Labor Productivity: Iran Case Study
    Kiyanoosh Golchin Rad
    Soo-Yong Kim
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2018, 42 : 165 - 180
  • [7] Identifying factors affecting construction labour productivity in India and measures to improve productivity
    Agrawal A.
    Halder S.
    [J]. Asian Journal of Civil Engineering, 2020, 21 (4) : 569 - 579
  • [8] Factors Affecting Construction Labor Productivity: Iran Case Study
    Rad, Kiyanoosh Golchin
    Kim, Soo-Yong
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2018, 42 (02) : 165 - 180
  • [9] Applying Total Interpretive Structural Modeling to Study Factors Affecting Construction Labour Productivity
    Sandbhor, Sayali
    Botre, Rohan
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2014, 14 (01): : 20 - 31
  • [10] Correction to: Factors Affecting Construction Labor Productivity: Iran Case Study
    Kiyanoosh Golchin Rad
    Soo-Yong Kim
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2018, 42 : 331 - 331