Factors Affecting Construction Labor Productivity: Iran Case Study

被引:0
|
作者
Kiyanoosh Golchin Rad
Soo-Yong Kim
机构
[1] Pukyong National University,Department of Civil Engineering, Interdisciplinary Program of Construction Engineering and Management
关键词
Labor productivity; Construction management; Exploratory Factor Analysis (EFA); Analytical Hierarchy Process (AHP); Structural Equation Model (SEM);
D O I
暂无
中图分类号
学科分类号
摘要
Construction projects, as a labor-intensive industry, are directly involved with workforce management. Hence, the labor productivity issue is of remarkable interest in both the construction industry and academia because of its impact on time, cost, and quality of project. Due to the importance of labor productivity, an intensive literature review has been done to identify critical factors. However, a lack of previous studies on the causal relationships between labor productivity factors in the Iranian construction industry was discovered through the literature review. Hence, the study objective is to prioritize and highlight the factors most affecting construction labor productivity in Iran. The potential factors were identified and a questionnaire was prepared, including 33 factors, and it was then distributed among construction project managers who have more than 5 years of experience in the Iranian construction industry. Out of 200 questionnaires, 157 questionnaires were returned by participants. Of these, 152 valid collected data sets were analyzed through the Analytical Hierarchy Process (AHP) as a decision-making tool and the Structural Equation Model (SEM) as a multivariate analysis technique, in parallel for accuracy and reliability of findings. Findings from both tools, AHP and SEM, were compared. Eventually, “Labor Characteristics,” by 0.384 priority weights, was selected as the most prioritized criteria; “Tools and Equipment” was selected among six factors as the most common significant factor between both AHP and SEM, ranked by 0.191 priority weights in AHP and a 0.82 factor loading in SEM. Furthermore, “Lack of required tools and/or equipment” has been ranked as the most significant sub-criteria with 0.444 weights; “Delay” has been chosen as the most significant latent variable in SEM with a 0.83 factor lading. The results of the study would be valuable for any participants in the construction industry and academia, particularly civil engineers who are involved in Iranian or Middle Eastern construction projects.
引用
收藏
页码:165 / 180
页数:15
相关论文
共 50 条
  • [1] Factors Affecting Construction Labor Productivity: Iran Case Study
    Rad, Kiyanoosh Golchin
    Kim, Soo-Yong
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2018, 42 (02) : 165 - 180
  • [2] Correction to: Factors Affecting Construction Labor Productivity: Iran Case Study
    Kiyanoosh Golchin Rad
    Soo-Yong Kim
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2018, 42 : 331 - 331
  • [3] Factors Affecting Construction Labor Productivity: Iran Case Study (vol 42, pg 165, 2018)
    Rad, Kiyanoosh Golchin
    Kim, Soo-Yong
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2018, 42 (03) : 331 - 331
  • [4] A hybrid framework to model factors affecting construction labour productivity Case study of Iran
    Jalal, Majid Parchami
    Shoar, Shahab
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2019, 24 (03) : 630 - 654
  • [5] Factors Affecting Construction Labor Productivity in Kuwait
    Jarkas, Abdulaziz M.
    Bitar, Camille G.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (07) : 811 - 820
  • [6] A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN
    Ghoddousi, Parviz
    Hosseini, Mohammad Reza
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2012, 18 (01) : 99 - 116
  • [7] Latent Structures of the Factors Affecting Construction Labor Productivity
    Dai, Jiukun
    Goodrum, Paul M.
    Maloney, William F.
    Srinivasan, Cidambi
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (05): : 397 - 406
  • [8] Factors affecting construction labour productivity: a case study of Jordan
    Hiyassat, Mohammed A.
    Hiyari, Montaser A.
    Sweis, Ghaleb J.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2016, 16 (02) : 138 - 149
  • [9] Key Factors Affecting Labor Productivity in Offsite Construction Projects
    Assaad, Rayan H.
    El-adaway, Islam H.
    Hastak, Makarand
    Needy, Kim LaScola
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (01)
  • [10] Structural Equation Model of the Factors Affecting Construction Labor Productivity
    Durdyev, Serdar
    Ismail, Syuhaida
    Kandymov, Nurmurat
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (04)