Unit Commitment Considering Generation Flexibility and Environmental Constraints

被引:0
|
作者
Lu, Shuai [1 ]
Makarov, Yuri V. [1 ]
Zhu, Yunhua [1 ]
Lu, Ning [1 ]
Kumar, Nirupama Prakash [1 ]
Chakrabarti, Bhujanga B. [1 ,2 ]
机构
[1] Pacific Northwest Natl Lab, Richland, WA 99354 USA
[2] Transpower New Zealand LTD, Wellington, New Zealand
关键词
Unit commitment; generation flexibility; environmental constraints; emission rate; renewable; hydro generation; wind generation;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper proposes a new framework for the power system unit commitment process, incorporating generation flexibility requirements and environmental constraints into the existing unit commitment algorithm. The generation flexibility requirements are to address the uncertainty and variability associated with large amounts of intermittent resources as well as with load, which cause real-time balancing requirements to be variable and less predictable. The proposed flexibility requirements include capacity, ramp-rate and energy (or ramp duration) for both upward and downward balancing reserves. The environmental constraints include emission limits for fossil fuel-fired generators and ecological regulations for hydro power plants. The calculation of emission rates is formulated. Unit commitment under this new framework will be critical to the economic and reliable operation of the power grid and the minimization of its negative environmental impacts, especially when high penetration levels of intermittent resources are being approached, as required by the renewable portfolio standards in many states.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] Solutions to practical unit commitment problems with operational, power flow and environmental constraints
    Raglend, I. Jacob
    Padhy, Narayana Prasad
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 2785 - +
  • [22] Representing Operational Flexibility in Generation Expansion Planning Through Convex Relaxation of Unit Commitment
    Hua, Bowen
    Baldick, Ross
    Wang, Jianhui
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (02) : 2272 - 2281
  • [23] Unit Commitment Considering Inertia and Reserve
    Shigenobu, Ryuto
    IEEJ Transactions on Power and Energy, 2024, 144 (10) : 514 - 517
  • [24] Modeling the Hidden Flexibility of Clustered Unit Commitment
    Morales-Espana, German
    Tejada-Arango, Diego A.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2019, 34 (04) : 3294 - 3296
  • [25] Stochastic emission constraints on unit commitment
    Laia, R.
    Pousinho, H. M. I.
    Melicio, R.
    Mendes, V. M. F.
    CONFERENCE ON ELECTRONICS, TELECOMMUNICATIONS AND COMPUTERS - CETC 2013, 2014, 17 : 437 - 444
  • [26] Unit commitment with dual variable constraints
    Motto, AL
    Galiana, FD
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (01) : 330 - 338
  • [27] Unit Commitment with Energy Storage Considering Operation Flexibility at Sub-hourly Time-scales
    Zhang L.
    Yang J.
    Jian X.
    Zhang F.
    Han X.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2018, 42 (16): : 48 - 56
  • [28] A MILP Based Framework for the Hydro Unit Commitment Considering Irregular Forbidden Zone Related Constraints
    Zhao, Zhipeng
    Cheng, Chuntian
    Liao, Shengli
    Li, Yapeng
    Lu, Quan
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2021, 36 (03) : 1819 - 1832
  • [29] Solving Unit Commitment and Economic Dispatch Simultaneously Considering Generator Constraints by Using Nested PSO
    Farsadi, Murtaza
    Hosseinnejad, Hadi
    Dizaji, Tohid Sattarpour
    2015 9TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONICS ENGINEERING (ELECO), 2015, : 493 - 499
  • [30] Unit Commitment of Power System With High Proportion of Wind Power Considering Frequency Safety Constraints
    Lin H.
    Hou K.
    Chen L.
    Xia D.
    Min Y.
    Qin S.
    Zhang B.
    Chen, Lei (chenlei08@tsinghua.edu.cn), 1600, Power System Technology Press (45): : 1 - 9