Design and Construction of the South Hartford CSO Tunnel

被引:0
|
作者
Sullivan, James [1 ]
Perham, Andrew [2 ]
机构
[1] AECOM, 500 Enterprise Dr, Rocky Hill, CT 06067 USA
[2] Metropolitan Dist, 555 Main St,POB 800, Hartford, CT 06142 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The South Hartford CSO Tunnel (South Tunnel) project is a significant component of the Metropolitan District's SSO/CSO control program in Hartford, CT. The South Tunnel is a 4-mi. -long, 18-ft internal diameter wet weather tunnel that will eliminate sanitary sewer overflows (SSOs) and control combined sewer overflows (CSOs). Sewer diversion structures will be constructed at each CSO and SSO to replicate or intercept overflows and divert them to near-surface consolidation sewers. These consolidation sewers will in turn, discharge to one of eight hydraulic tangential vortex drop shafts which will convey the flow to the deep rock tunnel. Once in the tunnel, the sewer overflows will be stored and then pumped to receive proper treatment. The project was split into five construction contracts totalling approximately $410 MM. Advanced utility relocation and electrical upgrades have been completed. Construction of the deep rock tunnel, shafts, and deep rock connector tunnels are underway. The 35-ft diameter launch shaft has been excavated. The 70-ft diameter pump station shaft has been excavated to 80 ft below grade. The tunnel boring machine (TBM) has arrived onsite and is being assembled. By July 2018, the launch shaft, pump station shaft, fifteen drilled shafts, and the starter and tail tunnels should all be excavated and the TBM should be beginning its journey. This paper and presentation will focus on the design basis, progress to date, and lessons learned.
引用
收藏
页码:69 / 80
页数:12
相关论文
共 50 条
  • [41] A design study for a road tunnel: The effects of construction detail
    Higgins, KG
    Edmonds, HE
    Fernie, R
    Pott, DM
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 105 - 109
  • [42] Design and construction of a sewer tunnel in difficult site conditions
    Croce, P.
    Di Maio, S.
    Speciale, G.
    Cassibba, L.
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 7TH INTERNATIONAL SYMPOSIUM, 2012, : 157 - 164
  • [43] Design and construction of the enlargement of a tunnel section of unusual dimension
    Targas, DN
    Junior, DM
    de Oliveira, RA
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 993 - 1000
  • [44] Strategies in tunnel design, construction, maintenance, inspection and operations
    Capers, H., Jr.
    Jiang, L.
    Thompson, K.
    MODERN TECHNIQUES IN BRIDGE ENGINEERING, 2011, : 265 - 274
  • [45] Second Manapouri tailrace tunnel design and construction considerations
    Heer, B
    Essex, R
    Young, D
    1997 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1997, : 3 - 23
  • [46] Application of design-build contracts tunnel construction
    Robinson, RA
    Kucker, MS
    Gildner, JP
    NORTH AMERICAN TUNNELING 2002, 2002, : 109 - 118
  • [47] Design and construction of retaining structures for Lane Cove Tunnel
    Hewitt, Paul
    Burkitt, Stephen
    Baskaran, Bas
    Australian Geomechanics Journal, 2008, 43 (01): : 55 - 60
  • [48] Design considerations for construction of the Qinling Tunnel using TBM
    Liu, P
    Liang, WH
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2000, 15 (02) : 139 - 146
  • [49] Design and construction of the new tunnel at Genting Sempah, Malaysia
    Porter, SJ
    McRae, MT
    Wright, R
    1997 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1997, : 669 - 678
  • [50] Design, construction and commissioning of the Braunschweig Icing Wind Tunnel
    Bansmer, Stephan E.
    Baumert, Arne
    Sattler, Stephan
    Knop, Inken
    Leroy, Delphine
    Schwarzenboeck, Alfons
    Jurkat-Witschas, Tina
    Voigt, Christiane
    Pervier, Hugo
    Esposito, Biagio
    ATMOSPHERIC MEASUREMENT TECHNIQUES, 2018, 11 (06) : 3221 - 3249